The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for September 24, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | MAXIMUM GENERATION ALERT SCHEDULED FOR 09/24 DAYS | * | ||
| Calvert Cliffs 2 | 100 | MAXIMUM GENERATION ALERT SCHEDULED FOR 09/24 DAYS | * | ||
| FitzPatrick | 0 | 09/12/2010 | REFUELING OUTAGE | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
| Limerick 2 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 0 | 09/12/2010 | REFUELING OUTAGE | ||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 97 | FEEDWATER HEATER ISSUE | |||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | REQUIRED TO MAINTAIN LAGGING VARS WHILE BREAKER 22 IS OOS | |||
| Susquehanna 1 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY - HOT WEATHER ALERT FOR 09/24 | * | ||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 88 | REDUCED POWER PER LOAD DISPATCHER FOR THE NEXT 72 HOURS DUE TO LINE WORK OFFSITE |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | 161 ATHENS LINE TAGGED OUT FOR MAINTENANCE AND UNION LINE OOS | |||
| Browns Ferry 2 | 100 | 161 ATHENS LINE TAGGED OUT FOR MAINTENANCE AND UNION LINE OOS | |||
| Browns Ferry 3 | 100 | 161 ATHENS LINE TAGGED OUT FOR MAINTENANCE AND UNION LINE OOS | |||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 0 | 09/17/2010 | REFUELING OUTAGE | ||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
| Farley 1 | 95 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Farley 2 | 100 | ||||
| Harris 1 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 0 | 09/11/2010 | DEFUELED. HOT WEATHER ALERT FOR 9/24 | * | |
| North Anna 2 | 100 | HOT WEATHER ALERT FOR 9/24 | * | ||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | * | |||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 84 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Sequoyah 2 | 100 | * | |||
| Summer | 0 | 09/22/2010 | MAINTENANCE OUTAGE - SHUTDOWN TO ADDRESS LOW OIL LEVEL IN RCP "A" - ANTICIPATE RESTART IN 24-48 HOURS. | ||
| Surry 1 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
| Surry 2 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
| Turkey Point 3 | 0 | 09/23/2010 | REACTOR TRIP DUE TO GENERATOR PROTECTION RELAY. SEE EN #46274 | * | 1 |
| Turkey Point 4 | 0 | 09/21/2010 | STARTUP IN PROGRESS | * | |
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 92 | HOLDING POWER FOR RX ENGR EVAL | * | ||
| Braidwood 2 | 100 | ||||
| Byron 1 | 89 | INCREASING POWER TO 100% | * | ||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Duane Arnold | 100 | * | |||
| Fermi 2 | 100 | 120KV RADKA LINE OOS FOR MAINTENANCE | |||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 95 | REDUCED POWER TO EVALUATE FEEDWATER HEATER TUBE LEAKS. | |||
| Palisades | 97 | COASTDOWN TO REFUELING OUTAGE. 345KV (COOK-2) LINE OUT OF SERVICE | |||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026