Power Reactor Status Report for September 24, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | MAXIMUM GENERATION ALERT SCHEDULED FOR 09/24 DAYS | * | ||
Calvert Cliffs 2 | 100 | MAXIMUM GENERATION ALERT SCHEDULED FOR 09/24 DAYS | * | ||
FitzPatrick | 0 | 09/12/2010 | REFUELING OUTAGE | ||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
Limerick 2 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 0 | 09/12/2010 | REFUELING OUTAGE | ||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 97 | FEEDWATER HEATER ISSUE | |||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | REQUIRED TO MAINTAIN LAGGING VARS WHILE BREAKER 22 IS OOS | |||
Susquehanna 1 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY - HOT WEATHER ALERT FOR 09/24 | * | ||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 88 | REDUCED POWER PER LOAD DISPATCHER FOR THE NEXT 72 HOURS DUE TO LINE WORK OFFSITE |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | 161 ATHENS LINE TAGGED OUT FOR MAINTENANCE AND UNION LINE OOS | |||
Browns Ferry 2 | 100 | 161 ATHENS LINE TAGGED OUT FOR MAINTENANCE AND UNION LINE OOS | |||
Browns Ferry 3 | 100 | 161 ATHENS LINE TAGGED OUT FOR MAINTENANCE AND UNION LINE OOS | |||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 0 | 09/17/2010 | REFUELING OUTAGE | ||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
Farley 1 | 95 | COASTDOWN TO REFUELING OUTAGE | * | ||
Farley 2 | 100 | ||||
Harris 1 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 0 | 09/11/2010 | DEFUELED. HOT WEATHER ALERT FOR 9/24 | * | |
North Anna 2 | 100 | HOT WEATHER ALERT FOR 9/24 | * | ||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | * | |||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 84 | COASTDOWN TO REFUELING OUTAGE | * | ||
Sequoyah 2 | 100 | * | |||
Summer | 0 | 09/22/2010 | MAINTENANCE OUTAGE - SHUTDOWN TO ADDRESS LOW OIL LEVEL IN RCP "A" - ANTICIPATE RESTART IN 24-48 HOURS. | ||
Surry 1 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
Surry 2 | 100 | HOT WEATHER ALERT FOR 09/24 | * | ||
Turkey Point 3 | 0 | 09/23/2010 | REACTOR TRIP DUE TO GENERATOR PROTECTION RELAY. SEE EN #46274 | * | 1 |
Turkey Point 4 | 0 | 09/21/2010 | STARTUP IN PROGRESS | * | |
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 92 | HOLDING POWER FOR RX ENGR EVAL | * | ||
Braidwood 2 | 100 | ||||
Byron 1 | 89 | INCREASING POWER TO 100% | * | ||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | ||||
Dresden 3 | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
Duane Arnold | 100 | * | |||
Fermi 2 | 100 | 120KV RADKA LINE OOS FOR MAINTENANCE | |||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 95 | REDUCED POWER TO EVALUATE FEEDWATER HEATER TUBE LEAKS. | |||
Palisades | 97 | COASTDOWN TO REFUELING OUTAGE. 345KV (COOK-2) LINE OUT OF SERVICE | |||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 100 |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | ||||
San Onofre 3 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021