Power Reactor Status Report for September 10, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | * | |||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | MINIMUM GENERATION ALERT | * | ||
| Calvert Cliffs 2 | 100 | MINIMUM GENERATION ALERT | * | ||
| FitzPatrick | 90 | COASTDOWN TO REFUELING OUTAGE | |||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 0 | 09/03/2010 | SEE EN #46229 | ||
| Indian Point 3 | 0 | 09/09/2010 | MANUAL REACTOR TRIP. SEE EN# 46241 | * | 1 |
| Limerick 1 | 100 | ||||
| Limerick 2 | 73 | REDUCED POWER FOR ROD PATTERN ADJUSTMENT | * | ||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 89 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | * | |||
| Susquehanna 1 | 100 | MINIMUM GENERATION ALERT | * | ||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY MINIMUM GENERATION ALERT | * | ||
| Three Mile Island 1 | 100 | MINIMUM GENERATION ALERT | * | ||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 98 | POWER LIMITED TO ROD PATTERN LINE DUE TO FUEL ISSUES | |||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 91 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 0 | 09/09/2010 | AUTOMATIC REACTOR TRIP. SEE EN# 46238 | * | 1 |
| Saint Lucie 1 | 80 | ONE CIRC WATER PUMP OUT OF SERVICE | * | ||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 95 | COASTDOWN TO REFUELING OUTAGE | |||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 14 | INCREASING POWER | * | ||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 100 | * | |||
| Kewaunee | 100 | * | |||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 95 | REDUCED POWER TO EVALUATE FEEDWATER HEATER TUBE LEAKS. | |||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ON 9/11 - MAINTENANCE ON 230KV MORRO BAY TO MIDWAY LINE | * | ||
| Diablo Canyon 2 | 100 | ON 9/11 - MAINTENANCE ON 230KV MORRO BAY TO MIDWAY LINE | * | ||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 75 | MAIN CONDENSER TUBE REPAIR | * | ||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |