Power Reactor Status Report for August 13, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | * | |||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | 345KV FEEDER LINE #8 OOS FOR MAINTENANCE | |||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | ||||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 65 | LIMITED BY COOLING WATER DISCHARGE TEMPERATURES - POWER SUPPLY ALERT DUE TO HIGH SYSTEM DEMAND | * | ||
| Browns Ferry 2 | 65 | LIMITED BY COOLING WATER DISCHARGE TEMPERATURES - POWER SUPPLY ALERT DUE TO HIGH SYSTEM DEMAND | * | ||
| Browns Ferry 3 | 0 | 08/12/2010 | SHUTDOWN TO REPAIR PACKING LEAK ON HEAD VENT LINE - POWER SUPPLY ALERT DUE TO HIGH SYSTEM DEMAND | * | |
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | * | |||
| Hatch 1 | 97 | CONDENSATE TEMPERATURE LIMITED | * | ||
| Hatch 2 | 98 | CONDENSATE TEMPERATURE LIMITED | * | ||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | * | |||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | * | |||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 90 | ONE CIRC WATER PUMP OUT OF SERVICE | |||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | * | |||
| Dresden 3 | 100 | * | |||
| Duane Arnold | 99 | REDUCED POWER DUE TO CONDENSER BACKPRESSURE | * | ||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 99 | HOLDING POWER- ENTERED/EXITED TS REQUIRED S/D DUE TO ELEVATED UHS TEMP - SEE EN #46171 - UHS TEMP CURRENTLY 100 DEG F. | * | ||
| La Salle 2 | 83 | INCREASING POWER TO APPROXIMATELY 85% - ENTERED/EXITED TS REQUIRED S/D DUE TO ELEVATED UHS TEMP - SEE EN #46171 - UHS TEMP CURRENTLY 100 DEG F. | * | ||
| Monticello | 94 | REDUCED POWER TO EVALUATE FEEDWATER HEATER TUBE LEAKS. | * | ||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 0 | 08/12/2010 | FORCED OUTAGE - AUTOMATIC RX SCRAM ON TURBINE TRIP - SEE EN #46169 - ANTICIPATE RESTART WITHIN 24 HOURS | * | 1 |
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026