The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for July 8, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | * | |||
| Calvert Cliffs 2 | 83 | WATERBOX CLEANING | * | ||
| FitzPatrick | 99 | WILL PERFORM ROD PATTERN ADJUST TO INCREASE POWER - GRID OPERATOR REQUESTS LICENSEE LIMIT ACTIVITIES POTENTIALLY JEOPARDIZING THE GRID | |||
| Ginna | 100 | BOTH OFFSITE LINES CONSIDERED INOPERABLE - CONDITION CAUSING INOPERATILITY HAS BEEN CORRECTED - EVALUATION IN PROGRESS | |||
| Hope Creek 1 | 96 | HOLDING POWER DUE TO HIGH TEMPERATURE EFFECTS ON SECONDARY EFFICIENCY | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | * | |||
| Limerick 2 | 100 | * | |||
| Millstone 2 | 100 | * | |||
| Millstone 3 | 100 | * | |||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | * | |||
| Peach Bottom 3 | 100 | * | |||
| Pilgrim 1 | 100 | * | |||
| Salem 1 | 0 | 07/07/2010 | REACTOR TRIP - SEE EN #46075 | * | 1 |
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/8/10 (DURING THE DAY AND EVENING). | * | ||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY - HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/8/10 (DURING THE DAY AND EVENING). | * | ||
| Three Mile Island 1 | 100 | * | |||
| Vermont Yankee | 100 | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 97 | HOLDING POWER - MONITOR CONDENSER VACUUM | * | ||
| Browns Ferry 2 | 94 | CONDENSER WATERBOX REMOVED FROM SERVICE FOR TUBE LEAK REPAIR | * | ||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | * | |||
| Brunswick 2 | 100 | * | |||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 90 | HOLDING POWER FOR ROD ADJUSTMENT | * | ||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 98 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT FOR 7/8/10 (DURING THE DAY AND EVENING) | * | ||
| North Anna 2 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT FOR 7/8/10 (DURING THE DAY AND EVENING) | * | ||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 0 | 03/28/2010 | REFUELING OUTAGE | ||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/8/10 (DURING THE DAY AND EVENING) | * | ||
| Surry 2 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/8/10 (DURING THE DAY AND EVENING) | * | ||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | * | |||
| La Salle 2 | 100 | * | |||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026