| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) | * | ||
| Calvert Cliffs 2 | 100 | MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) | * | ||
| FitzPatrick | 99 | WILL PERFORM ROD PATTERN ADJUST TO INCREASE POWER - GRID OPERATOR REQUESTS LICENSEE LIMIT ACTIVITIES POTENTIALLY JEOPARDIZING THE GRID | * | ||
| Ginna | 100 | BOTH OFFSITE LINES CONSIDERED INOPERABLE - CONDITION CAUSING INOPERATILITY HAS BEEN CORRECTED - EVALUATION IN PROGRESS | * | ||
| Hope Creek 1 | 91 | REDUCED POWER DUE TO HIGH TEMPERATURE EFFECTS ON SECONDARY EFFICIENCY | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) - HEAVY LOAD CONCERN | * | ||
| Limerick 2 | 98 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) - HEAVY LOAD CONCERN - POWER REDUCED DUE TO HIGH CONDENSATE RETURN TEMPERATURE CONCERN | * | ||
| Millstone 2 | 100 | ISO NEW ENGLAND ISSUED GENERATION ALERT - NO ACTIONS TAKEN YET | * | ||
| Millstone 3 | 100 | ISO NEW ENGLAND ISSUED GENERATION ALERT - NO ACTIONS TAKEN YET | * | ||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) | * | ||
| Peach Bottom 3 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) | * | ||
| Pilgrim 1 | 100 | ISO NEW ENGLAND ALERT - DO NOT PERFORM ANY HIGH RISK EVOLUTIONS | * | ||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 98 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) - REDUCED POWER DUE TO CONDENSER BACK PRESSURE | * | ||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY - HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) - REDUCED POWER SLIGHTLY DUE TO CONDENSER BACK PRESSURE | * | ||
| Three Mile Island 1 | 100 | MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) | * | ||
| Vermont Yankee | 100 | ISO NEW ENGLAND ALERT - DO NOT PERFORM ANY HIGH RISK EVOLUTIONS | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 96 | CONDENSER WATERBOX REMOVED FROM SERVICE FOR TUBE LEAK REPAIR | * | ||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ANTICIPATE ENTERING SYSTEM RELIABILITY ALERT LEVEL 0 AT 1000 HRS ON 7/7/10 | * | ||
| Brunswick 2 | 100 | ANTICIPATE ENTERING SYSTEM RELIABILITY ALERT LEVEL 0 AT 1000 HRS ON 7/7/10 | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
| Farley 1 | 100 | * | |||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 68 | INCREASING POWER TO 100% | * | ||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 98 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT FOR 7/7/10 (DURING THE DAY AND EVENING) | * | ||
| North Anna 2 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT FOR 7/7/10 (DURING THE DAY AND EVENING) | * | ||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 0 | 03/28/2010 | REFUELING OUTAGE | ||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) | * | ||
| Surry 2 | 100 | HOT WEATHER ALERT - MAXIMUM EMERGENCY GENERATION ALERT IN EFFECT ON 7/7/10 (DURING THE DAY AND EVENING) | * | ||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | HEAVY LOAD VOLTAGE SCHEDULE | * | ||
| La Salle 2 | 100 | HEAVY LOAD VOLTAGE SCHEDULE | * | ||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 100 |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | * | |||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |