Power Reactor Status Report for May 23, 2010

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 100     *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 05/22/2010 REACTOR TRIP - SEE EN #45945 * 1
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 40   REDUCED FOR SCRAM TIME TESTING, WATER BOX CLEANING, & B RECIRC PUMP MAINTENANCE *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100   CONTINGENCY IN EFFECT TO REDUCE POWER TO 800MWE DUE TO 363 LINE MAINTENANCE UNTIL MAY 28 *  
Susquehanna 1 94   100% ELECTRICAL CAPABILITY, MIN GENERATION ALERT *  
Susquehanna 2 94   100% ELECTRICAL CAPABILITY, MIN GENERATION ALERT *  
Three Mile Island 1 100        
Vermont Yankee 12   PLACING GENERATOR ON LINE *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 64   MAINTENANCE ON REACTOR FEED PUMP    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED    
Farley 1 100        
Farley 2 0 05/22/2010 REACTOR TRIP - SEE EN #45946 * 1
Harris 1 100        
Hatch 1 100        
Hatch 2 100     *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 04/24/2010 REFUELING OUTAGE *  
Oconee 3 100        
Robinson 2 0 03/28/2010 DEFUELED    
Saint Lucie 1 0 04/04/2010 REFUELING OUTAGE    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 0 05/21/2010 TURBINE TRIP / REACTOR TRIP - SEE EN#45944    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 02/27/2010 DEFUELED    
Dresden 2 100        
Dresden 3 75   REDUCED POWER FOR TURBINE VALVE TESTING *  
Duane Arnold 100        
Fermi 2 100        
Kewaunee 100        
La Salle 1 66   REDUCED FOR SURVEILLANCES *  
La Salle 2 100        
Monticello 100     *  
Palisades 100        
Perry 1 100     *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 0 04/16/2010 STATUP IN PROGRESS - JUST CRITICAL *  
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 0 04/17/2010 PREPARING FOR STARTUP *  
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100     *  
Grand Gulf 1 0 04/25/2010 PREPARING FOR STARTUP    
Palo Verde 1 12   PREPARING TO SYNCH GENERATOR TO GRID *  
Palo Verde 2 100        
Palo Verde 3 98   REDUCED FOR TESTING *  
River Bend 1 100        
San Onofre 2 100     *  
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100     *  
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021