Power Reactor Status Report for April 21, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 82 | REDUCED POWER FOR WATERBOX MAINTENANCE - EXPECTED COMPLETION 4/30 | |||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 0 | 04/10/2010 | DEFUELED | * | |
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 0 | 04/02/2010 | REFUELING OUTAGE | ||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 0 | 04/03/2010 | REFUELING OUTAGE | ||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | CONTINGENCY IN EFFECT TO REDUCE POWER TO 800MWE DUE TO LINE MAINTENANCE | * | ||
| Susquehanna 1 | 13 | HOLDING POWER WHILE TROUBLESHOOTING - GENERATOR OFFLINE | * | ||
| Susquehanna 2 | 64 | PERFORMING MAINTENANCE TO CORRECT FEEDWATER HEATER LEAK | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 93 | COASTDOWN TO REFUELING OUTAGE | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 0 | 02/26/2010 | REFUELING OUTAGE | ||
| Brunswick 2 | 98 | INCREASING POWER TO 100% | * | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
| Farley 1 | 100 | ||||
| Farley 2 | 0 | 04/04/2010 | DEFUELED | ||
| Harris 1 | 100 | ||||
| Hatch 1 | 58 | REDUCING POWER TO 50% FOR COOLING FAN REPAIRS | * | ||
| Hatch 2 | 95 | INCREASING POWER TO 100% | * | ||
| McGuire 1 | 48 | HOLDING POWER FOR TESTING | * | ||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 0 | 03/20/2010 | REFUELING OUTAGE | ||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 0 | 04/18/2010 | FORCED OUTAGE - REPAIR FEEDWATER HEATER TUBE LEAK - RCS TEMP 205 F | * | |
| Robinson 2 | 0 | 03/28/2010 | REFUELING OUTAGE - RV HEAD LIFT IN PROGRESS | * | |
| Saint Lucie 1 | 0 | 04/04/2010 | DEFUELED | ||
| Saint Lucie 2 | 0 | 04/15/2010 | TRIP - SEE EN# 45843 | ||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 0 | 04/18/2010 | REFUELING OUTAGE | * | |
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 02/27/2010 | DEFUELED | ||
| Dresden 2 | 100 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 100 | ||||
| Fermi 2 | 100 | 120 KV RADKA LINE INCOMING FEED OOS | * | ||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 0 | 04/16/2010 | REFUELING OUTAGE | ||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 86 | INCREASING POWER | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 0 | 04/18/2010 | FORCED OUTAGE - DRAINED DOWN FOR REPLACEMENT OF "C" RCP SEAL | * | |
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 0 | 04/17/2010 | REFUELING OUTAGE - RV HEAD DETENSIONED | * | |
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 0 | 04/03/2010 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 85 | COASTDOWN TO REFUELING OUTAGE | |||
| Palo Verde 1 | 0 | 04/02/2010 | DEFUELED | ||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 98 | WILL HOLD POWER AT 98% UNTIL AMAG IS RETURNED TO SERVICE | * | ||
| San Onofre 3 | 50 | REDUCED POWER FOR FUEL MANAGEMENT | |||
| South Texas 1 | 100 | ||||
| South Texas 2 | 0 | 03/27/2010 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |