Power Reactor Status Report for April 21, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 82 | REDUCED POWER FOR WATERBOX MAINTENANCE - EXPECTED COMPLETION 4/30 | |||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 0 | 04/10/2010 | DEFUELED | * | |
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 0 | 04/02/2010 | REFUELING OUTAGE | ||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 0 | 04/03/2010 | REFUELING OUTAGE | ||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | CONTINGENCY IN EFFECT TO REDUCE POWER TO 800MWE DUE TO LINE MAINTENANCE | * | ||
Susquehanna 1 | 13 | HOLDING POWER WHILE TROUBLESHOOTING - GENERATOR OFFLINE | * | ||
Susquehanna 2 | 64 | PERFORMING MAINTENANCE TO CORRECT FEEDWATER HEATER LEAK | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 93 | COASTDOWN TO REFUELING OUTAGE | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 0 | 02/26/2010 | REFUELING OUTAGE | ||
Brunswick 2 | 98 | INCREASING POWER TO 100% | * | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
Farley 1 | 100 | ||||
Farley 2 | 0 | 04/04/2010 | DEFUELED | ||
Harris 1 | 100 | ||||
Hatch 1 | 58 | REDUCING POWER TO 50% FOR COOLING FAN REPAIRS | * | ||
Hatch 2 | 95 | INCREASING POWER TO 100% | * | ||
McGuire 1 | 48 | HOLDING POWER FOR TESTING | * | ||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 03/20/2010 | REFUELING OUTAGE | ||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 0 | 04/18/2010 | FORCED OUTAGE - REPAIR FEEDWATER HEATER TUBE LEAK - RCS TEMP 205 F | * | |
Robinson 2 | 0 | 03/28/2010 | REFUELING OUTAGE - RV HEAD LIFT IN PROGRESS | * | |
Saint Lucie 1 | 0 | 04/04/2010 | DEFUELED | ||
Saint Lucie 2 | 0 | 04/15/2010 | TRIP - SEE EN# 45843 | ||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 0 | 04/18/2010 | REFUELING OUTAGE | * | |
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 0 | 02/27/2010 | DEFUELED | ||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 100 | 120 KV RADKA LINE INCOMING FEED OOS | * | ||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 0 | 04/16/2010 | REFUELING OUTAGE | ||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 86 | INCREASING POWER | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 0 | 04/18/2010 | FORCED OUTAGE - DRAINED DOWN FOR REPLACEMENT OF "C" RCP SEAL | * | |
Arkansas Nuclear 2 | 100 | ||||
Callaway | 0 | 04/17/2010 | REFUELING OUTAGE - RV HEAD DETENSIONED | * | |
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 0 | 04/03/2010 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 85 | COASTDOWN TO REFUELING OUTAGE | |||
Palo Verde 1 | 0 | 04/02/2010 | DEFUELED | ||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 98 | WILL HOLD POWER AT 98% UNTIL AMAG IS RETURNED TO SERVICE | * | ||
San Onofre 3 | 50 | REDUCED POWER FOR FUEL MANAGEMENT | |||
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 03/27/2010 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |