The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for April 10, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 55 | A RFP SEAL REPLACEMENT | |||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 0 | 03/10/2010 | REFUELING OUTAGE | ||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 0 | 03/21/2010 | REFUELING OUTAGE | ||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 0 | 04/02/2010 | REFUELING OUTAGE. ONE OF THE OFFSITE FEEDER LINES (115KV LINE 6) OOS | ||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 94 | INCREASING POWER | * | ||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 0 | 04/03/2010 | DEFUELED | * | |
| Salem 2 | 100 | 500 KV LINE 5024 OOS | * | ||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 0 | 03/01/2010 | REFUELING OUTAGE | ||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 96 | COASTDOWN TO REFUELING OUTAGE |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 40 | PLACING FEEDWATER HEATERS IN SERVICE | * | ||
| Brunswick 1 | 0 | 02/26/2010 | REFUELING OUTAGE | ||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
| Farley 1 | 100 | ||||
| Farley 2 | 0 | 04/04/2010 | REFUELING OUTAGE | ||
| Harris 1 | 100 | ||||
| Hatch 1 | 100 | ||||
| Hatch 2 | 0 | 04/04/2010 | MAINTENANCE OUTAGE- REPLACE SRVs | ||
| McGuire 1 | 0 | 03/13/2010 | REFUELING OUTAGE | ||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 0 | 03/20/2010 | DEFUELED | ||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 0 | 03/28/2010 | REFUELING OUTAGE | ||
| Saint Lucie 1 | 0 | 04/04/2010 | REFUELING OUTAGE | ||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 82 | HOLDING FOR NI ADJUSTMENT AFTER FLUX MAP | * | ||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 42 | INCREASING POWER | * | ||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 02/27/2010 | DEFUELED | ||
| Dresden 2 | 100 | * | |||
| Dresden 3 | 100 | * | |||
| Duane Arnold | 100 | ||||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | CIRC WATER PUMP REPAIRS STILL IN PROGRESS | |||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 0 | 03/14/2010 | REFUELING OUTAGE |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 0 | 03/21/2010 | REFUELING OUTAGE | ||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 0 | 04/03/2010 | REFUELING OUTAGE. DEFUELED | * | |
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 0 | 04/08/2010 | TS REQUIRED S/D. SEE EN #45828. | ||
| Grand Gulf 1 | 59 | COASTDOWN TO REFUELING OUTAGE. POWER REDUCED FOR ROD TESTING | * | ||
| Palo Verde 1 | 0 | 04/02/2010 | REFUELING OUTAGE | ||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 18 | HOLDING TO TROUBLE-SHOOT TURBINE CONTROL DIGITAL I&C PROBLEM | * | ||
| San Onofre 3 | 50 | REDUCED POWER FOR FUEL MANAGEMENT | |||
| South Texas 1 | 100 | ||||
| South Texas 2 | 0 | 03/27/2010 | REFUELING OUTAGE. DEFUELED | ||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026