Power Reactor Status Report for March 31, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 0 | 03/10/2010 | REFUELING OUTAGE - CORE RELOAD COMPLETED | ||
Indian Point 3 | 100 | REDUNDANT 138KV FEEDER #95891 OOS FOR MAINTENANCE | |||
Limerick 1 | 0 | 03/21/2010 | REFUELING OUTAGE | ||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | 48-HR ACTION STATEMENT FOR 'B' EDG INOP DUE TO PM | * | ||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | LOAD MAINTAINED GREATER THAN 357 KVARS DUE TO LINE #394 OOS UNTIL MID-MAY | |||
Susquehanna 1 | 0 | 03/01/2010 | REFUELING OUTAGE | ||
Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 98 | COASTDOWN TO REFUELING OUTAGE | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | * | |||
Browns Ferry 2 | 100 | * | |||
Browns Ferry 3 | 0 | 02/27/2010 | REFUELING OUTAGE | * | |
Brunswick 1 | 0 | 02/26/2010 | REFUELING OUTAGE | ||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
Farley 1 | 100 | ||||
Farley 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 0 | 03/13/2010 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS | * | |
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 03/20/2010 | DEFUELED | ||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 0 | 03/28/2010 | FORCED OUTAGE | * | |
Saint Lucie 1 | 74 | COASTDOWN TO REFUELING OUTAGE | * | ||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 58 | REDUCED POWER AFTER REMOVING FROM SERVICE "2A" MAIN FEEDWATER PUMP FOR REPAIRS | * | ||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | ||||
Vogtle 2 | 0 | 03/07/2010 | REFUELING OUTAGE | * | |
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 0 | 03/02/2010 | REFUELING OUTAGE - RV HEAD SET BUT NOT TENSIONED | * | |
D.C. Cook 2 | 100 | ||||
Davis-Besse | 0 | 02/27/2010 | DEFUELED | ||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 100 | ||||
Fermi 2 | 37 | INCREASING POWER TO 100% | * | ||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 85 | "B" RFP REPAIRS COMPLETED - RESTORATION IN PROGRESS | * | ||
Point Beach 1 | 0 | 02/28/2010 | REFUELING OUTAGE - 345KV LINE "121" OOS FOR MAINTENANCE | ||
Point Beach 2 | 100 | 345KV LINE "121" OOS FOR MAINTENANCE | |||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 100 | ||||
Quad Cities 2 | 0 | 03/14/2010 | REFUELING OUTAGE |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 0 | 03/21/2010 | REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS | ||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 40 | REDUCED POWER FOR FEEDWATER HEATER REPAIR | * | ||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 96 | COASTDOWN TO REFUELING OUTAGE | * | ||
Palo Verde 1 | 97 | HOLDING POWER DUE TO TURBINE FIRST STAGE PRESSURE CONCERN | |||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 0 | 09/26/2009 | EXITING REFUELING / MAINTENANCE OUTAGE | ||
San Onofre 3 | 50 | REDUCED POWER FOR FUEL MANAGEMENT | |||
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 03/27/2010 | REFUELING OUTAGE | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |