Power Reactor Status Report for March 10, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 0 | 02/18/2010 | REFUELING OUTAGE | ||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 0 | 03/10/2010 | ENTERING REFUELING OUTAGE BACKUP 13.8 KV FEEDER OOS | * | |
| Indian Point 3 | 100 | BACKUP 13.8 KV FEEDER OOS | |||
| Limerick 1 | 96 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Limerick 2 | 20 | TURBINE GENERATOR REPAIR | * | ||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | 500KV LINE 5023 OUT OF SERVICE | |||
| Salem 2 | 100 | 500KV LINE 5023 OUT OF SERVICE | |||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 0 | 03/01/2010 | REFUELING OUTAGE | ||
| Susquehanna 2 | 94 | 100% ELECTRICAL CAPABILITY | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 22 | WORKING ON '2B' TRANSFORMER | * | ||
| Browns Ferry 3 | 0 | 02/27/2010 | REFUELING OUTAGE | ||
| Brunswick 1 | 0 | 02/26/2010 | REFUELING OUTAGE | ||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 0 | 09/25/2009 | DEFUELED | ||
| Farley 1 | 85 | INCREASING POWER | * | ||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 0 | 02/07/2010 | EXITING REFUELING OUTAGE | * | |
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 0 | 03/07/2010 | ENTERING REFUELING OUTAGE | ||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 92 | REPAIRS TO FW REHEATER | * | ||
| D.C. Cook 1 | 0 | 03/02/2010 | REFUELING OUTAGE | ||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 0 | 02/27/2010 | REFUELING OUTAGE | ||
| Dresden 2 | 100 | ||||
| Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | |||
| Duane Arnold | 100 | ||||
| Fermi 2 | 100 | ||||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | * | |||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 0 | 02/28/2010 | DEFUELED 345KV LINE "121" OOS FOR MAINTENANCE | * | |
| Point Beach 2 | 100 | 345KV LINE "121" OOS FOR MAINTENANCE | * | ||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 100 | ||||
| Quad Cities 2 | 95 | COASTDOWN TO REFUELING OUTAGE |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | EN #45754 - UNANALYZED CONDITION - POSTULATED SUSTAINED DEGRADED VOLTAGE ON STARTUP OFFSITE POWER SOURCE. | * | ||
| Diablo Canyon 2 | 100 | EN #45754 - UNANALYZED CONDITION - POSTULATED SUSTAINED DEGRADED VOLTAGE ON STARTUP OFFSITE POWER SOURCE. | * | ||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 0 | 03/08/2010 | COMMENCING STARTUP | * | |
| Palo Verde 1 | 0 | 03/07/2010 | ENTERING MAINTENANCE OUTAGE | * | |
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 0 | 09/26/2009 | EXITING REFUELING / MAINTENANCE OUTAGE | * | |
| San Onofre 3 | 57 | REDUCING POWER 7% PER DAY FOR 7 DAYS FOR FUEL MANAGEMENT | * | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 18 | INCREASING POWER | * |