The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 3, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 1   STARTUP IN PROGRESS *  
Hope Creek 1 100        
Indian Point 2 100   138KV LINE 33332 L&M OOS    
Indian Point 3 100   138KV LINE 33332 L&M OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 0 09/13/2009 REFUELING OUTAGE    
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 0 09/30/2009 REFUELING OUTAGE *  
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 80   DOWNPOWER FOR WATERBOX CLEANING *  
Three Mile Island 1 100   HIGH GRID VOLTAGE WARNING *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   161 KV OFFSITE LINE OOS    
Browns Ferry 2 0 09/29/2009 RX SUBCRITICAL; 161 KV OFFSITE LINE OOS *  
Browns Ferry 3 100   161 KV OFFSITE LINE OOS    
Brunswick 1 93   DECREASING POWER FOR C.R. PATTERN ADJUSTMENT *  
Brunswick 2 90   INCREASING POWER    
Catawba 1 88   TURBINE CONTROL VALVE TESTING IN PROGRESS *  
Catawba 2 100        
Crystal River 3 0 09/25/2009 REFUELING OUTAGE *  
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 50   DOWNPOWER TO TROUBLESHOOT "B" FEEDPUMP WHICH IS OOS *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/05/2009 REFUELING OUTAGE    
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 10/02/2009 REACTOR TRIP SEE EN# 45404 *  
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 0 09/20/2009 REFUELING OUTAGE - DEFUELED    
Vogtle 2 100        
Watts Bar 1 0 09/20/2009 REFUELING OUTAGE - DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 09/13/2009 REFUELING OUTAGE *  
Byron 2 100        
Clinton 1   STARTUP IN PROGRESS *  
D.C. Cook 1 0 03/02/2009 FORCED OUTAGE    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY *  
Duane Arnold 100        
Fermi 2 0 09/30/2009 FORCED OUTAGE *  
Kewaunee 0 09/25/2009 REFUELING OUTAGE    
La Salle 1 100        
La Salle 2 100        
Monticello 52   INCREASING POWER TO 100% - ROD PATTERN ADJUST SCHEDULED FOR SUNDAY, 10/04. *  
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 09/11/2009 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
Prairie Island 2 100   CONTINGENCIES IN PLACE FOR BORIC ACID INTEGRATOR PROBLEM    
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 14   HOLDING POWER - GENERATOR OFFLINE *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 09/25/2009 REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 100   UNIT WILL ENTER RFO ON 10/4 *  
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 99   REDUCED POWER IN PREPARATION FOR MTC TESTING SCHEDULED FOR MONDAY, 10/04. *  
Palo Verde 2 0 10/02/2009 REFUELING OUTAGE *  
Palo Verde 3 100        
River Bend 1 0 09/20/2009 REFUELING OUTAGE    
San Onofre 2 0 09/26/2009 REFUELING OUTAGE    
San Onofre 3 100        
South Texas 1 0 09/30/2009 REFUELING OUTAGE *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.