Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Power Reactor Status Report for July 27, 2009

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 100     *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100   138 KV LINE 33332 L&M FEEDER OOS    
Indian Point 3 100   138 KV LINE 33332 L&M FEEDER OOS    
Limerick 1 100     *  
Limerick 2 100     *  
Millstone 2 100     *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 90   HOLDING POWER FOR CIRC WATER PUMP MAINT *  
Peach Bottom 2 100     *  
Peach Bottom 3 100   END OF LIFE COASTDOWN *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 94   100% ELECTRICAL CAPABILITY    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 98   INCREASING POWER    
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100     *  
North Anna 2 100     *  
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 07/12/2009 PREPARING FOR STARTUP    
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 0 03/02/2009 FORCED OUTAGE - SEE EN #44507    
D.C. Cook 2 0 07/26/2009 TRIP - SEE EN #45228 * 1
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY *  
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100     *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 92   INCREASING FOLLOWING ROD ADJUSTMENTS *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100     *  
Quad Cities 2 100     *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100     *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100     *  
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 94   RECOVERING - CIRC WATER INTAKE SEA GRASS CLOGGING *  
San Onofre 3 100     *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        