The NRC is modernizing nrc.gov with an updated design and improved navigation to enhance usability. We are committed to a smooth transition and will work to minimize any disruption. The site may be briefly unavailable at times during launch. Thank you for your patience.
Power Reactor Status Report for March 30, 2009
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | ||||
| Hope Creek 1 | 97 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 0 | 03/10/2009 | DEFUELED | ||
| Limerick 1 | 100 | ||||
| Limerick 2 | 0 | 03/22/2009 | REFUELING OUTAGE | ||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 0 | 03/20/2009 | REFUELING OUTAGE | ||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 49 | PERFORMING SURVEILLANCES THEN POWER ASCENSION | * | ||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 94 | 100% ELECTRICAL CAPABILITY | |||
| Susquehanna 2 | 90 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 0 | 02/27/2009 | REFUELING OUTAGE | ||
| Catawba 1 | 100 | ||||
| Catawba 2 | 0 | 03/06/2009 | DEFUELED | ||
| Crystal River 3 | 100 | ||||
| Farley 1 | 94 | COASTDOWN TO REFUELING OUTAGE | |||
| Farley 2 | 1 | HOLDING WHILE TROUBLESHOOTING FEEDPUMP STOP VALVE PROBLEM | * | ||
| Harris 1 | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Hatch 1 | 100 | ||||
| Hatch 2 | 0 | 02/08/2009 | REFUELING OUTAGE | ||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 0 | 03/07/2009 | REFUELING OUTAGE | ||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | * | |||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 0 | 03/26/2009 | REFUELING OUTAGE | ||
| Sequoyah 2 | 47 | POWER ASCENSION | * | ||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 0 | 03/15/2009 | DEFUELED | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 0 | 03/29/2009 | REFUELING OUTAGE | * | |
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 0 | 03/02/2009 | SEE EN #44507. | ||
| D.C. Cook 2 | 0 | 03/24/2009 | REFUELING OUTAGE | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
| Duane Arnold | 100 | ||||
| Fermi 2 | 0 | 03/27/2009 | REACTOR SCRAM DUE TO HIGH TURBINE VIBRATION SEE EN #44942 REFUELING OUTAGE | ||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 0 | 03/14/2009 | REFUELING OUTAGE | ||
| Palisades | 0 | 03/22/2009 | REFUELING OUTAGE | ||
| Perry 1 | 0 | 02/22/2009 | DEFUELED | ||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 93 | INCREASING POWER | * | ||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | * | |||
| Palo Verde 1 | 93 | INCREASING POWER | * | ||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 98 | S/G PRESSURE LIMITATION | |||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 | * |
Page Last Reviewed/Updated Tuesday, August 25, 2026
Page Last Reviewed/Updated Tuesday, August 25, 2026