Power Reactor Status Report for December 6, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 20   INCREASING POWER *  
Peach Bottom 2 100   SWITCHYARD 500KV LINE #5007 OUTAGE SCHEDULED FOR 12/1 THRU 12/19 - NO IMPACT ON ELECTRICAL REQUIREMENTS FOR SITE    
Peach Bottom 3 100   SWITCHYARD 500KV LINE #5007 OUTAGE SCHEDULED FOR 12/1 THRU 12/19 - NO IMPACT ON ELECTRICAL REQUIREMENTS FOR SITE    
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100   NOTIFIED BY NEW ENGLAND ISO TO IMPLEMENT CONTINGENCY FOR REDUCING POWER TO LESS THAN 800 MWE, IF NECESSARY, DUE TO SCHEDULED LINE OUTAGE FROM 12/1 TO 12/15.    
Susquehanna 1 75   CONDENSATE PUMP PACKING REPLACEMENT *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 95   #1 COOLING TOWER TRANSFORMER OOS INCREASING POWER *  
Browns Ferry 2 100   #1 COOLING TOWER TRANSFORMER OOS    
Browns Ferry 3 100   #1 COOLING TOWER TRANSFORMER OOS    
Brunswick 1 100     *  
Brunswick 2 99   AT FLOW LIMIT; ROD PATTERN ADJUSTMENT PLAN FOR WEEKEND IN PROGRESS    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 48   REPAIRS ON ONE CONDENSATE PUMP AND ONE FEEDPUMP *  
Farley 1 100        
Farley 2 100     *  
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 10/24/2008 EXITING REFUELING OUTAGE    
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 87   REDUCED CAPACITY WHILE PERFORMING 345KV PLANNED MAINTENANCE UNTIL 12/15 *  
D.C. Cook 1 0 09/20/2008 SEE EN #44507.    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 97   100% ELECTRICAL CAPABILITY    
Dresden 3 67   REDUCED FOR ROD PATTERN ADJUSTMENT AND DATA GATHERING *  
Duane Arnold 96   COASTDOWN TO REFUELING OUTAGE *  
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 0 12/05/2008 SCHEDULED SHUTDOWN FOR MAINTENANCE OUTAGE *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 10/26/2008 REFUELING OUTAGE - CORE RELOAD COMPLETED *  
Arkansas Nuclear 2 100        
Callaway 100   14 DAY LCO - ESSENTIAL SERVICE WATER SYSTEM UNTIL 12/15    
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100     *  
Palo Verde 2 0 11/21/2008 REPAIRS FOR HYDROGEN LEAK IN MAIN GENERATOR ONGOING    
Palo Verde 3 100        
River Bend 1 68   REDUCED FOR CONTROL ROD SEQUENCE EXCHANGE *  
San Onofre 2 99   STEAM GENERATOR LIMITATIONS    
San Onofre 3 0 10/12/2008 EXITING REFUELING OUTAGE    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours