Power Reactor Status Report for May 13, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 0 | 04/14/2008 | REFUELING OUTAGE | ||
| Calvert Cliffs 1 | 100 | * | |||
| Calvert Cliffs 2 | 100 | * | |||
| FitzPatrick | 100 | 115KV LINE (#4) TO BE TAKEN OOS ON 5/13/08 | * | ||
| Ginna | 85 | HOLDING POWER FOR FLUX MAPPING | * | ||
| Hope Creek 1 | 100 | ||||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 0 | 04/05/2008 | REFUELING OUTAGE. HEATUP IN PROGRESS | * | |
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | 500KV LINE (220-34) OOS FOR MAINTENANCE | |||
| Peach Bottom 3 | 100 | 500KV LINE (220-34) OOS FOR MAINTENANCE | |||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 0 | 05/12/2008 | TECH SPEC SHUTDOWN DUE TO INOPERABLE STEAM FLOW CHANNELS. SEE EN#44205 | * | |
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 94 | 100% ELECTRICAL CAPABILITY | * | ||
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | 500 KV TRINITY LINE OOS UNTIL 6/9/08. 500 KV MAURY LINE ALSO OOS | * | ||
| Browns Ferry 2 | 100 | 500 KV TRINITY LINE OOS UNTIL 6/9/08. 500 KV MAURY LINE ALSO OOS | * | ||
| Browns Ferry 3 | 0 | 03/18/2008 | REFUELING OUTAGE 500 KV TRINITY LINE OOS UNTIL 6/9/08. 500 KV MAURY LINE ALSO OOS | * | |
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 0 | 05/03/2008 | REFUELING OUTAGE. DEFUELED | * | |
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 90 | REDUCED POWER TO INVESTIGATE POSSIBLE LEAKING SRV | * | ||
| Hatch 2 | 72 | INCREASING POWER | * | ||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 0 | 04/11/2008 | REFUELING OUTAGE | ||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 0 | 05/04/2008 | REFUELING OUTAGE. DEFUELED | * | |
| Summer | 0 | 04/25/2008 | REFUELING OUTAGE DEFUELED | ||
| Surry 1 | 100 | ||||
| Surry 2 | 0 | 04/26/2008 | REFUELING OUTAGE CORE RELOAD IN PROGRESS | ||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 48 | INCREASING POWER | * | ||
| Vogtle 1 | 100 | ||||
| Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 0 | 04/20/2008 | REFUELING OUTAGE | ||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 100 | ||||
| Kewaunee | 97 | AMAG TESTING INPROGRESS | * | ||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 28 | HOLDING POWER FOR CHEMISTRY | * | ||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 0 | 04/11/2008 | REFUELING OUTAGE | ||
| Diablo Canyon 1 | 50 | REDUCED POWER FOR CIRC WATER TUNNEL CLEANING. 500KV LINE (MIDWAY #2) OOS | * | ||
| Diablo Canyon 2 | 100 | 500KV LINE (MIDWAY #2) OOS 5/12 | * | ||
| Fort Calhoun | 0 | 04/19/2008 | REFUELING OUTAGE. DEFUELED | ||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 0 | 03/28/2008 | REFUELING OUTAGE | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 100 | ||||
| San Onofre 3 | 1 | REACTOR STARTUP IN PROGRESS - NOT YET CRITICAL | * | ||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 0 | 04/26/2008 | DEFUELED | ||
| Wolf Creek 1 | 0 | 03/17/2008 | PREPARING FOR STARTUP |