The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 11, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 04/14/2008 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100     *  
Ginna 0 04/20/2008 PHYSICS TESTING IN PROGRESS *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 04/05/2008 REFUELING OUTAGE *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   500KV LINE (220-34) OOS FOR MAINTENANCE *  
Peach Bottom 3 100   500KV LINE (220-34) OOS FOR MAINTENANCE *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 62   INCREASING POWER *  
Seabrook 1 94   INCREASING POWER *  
Susquehanna 1 94   100% ELECTRICAL CAPABILITY    
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100   500 KV TRINITY LINE OOS UNTIL 6/9/08 *  
Browns Ferry 2 100   500 KV TRINITY LINE OOS UNTIL 6/9/08 *  
Browns Ferry 3 0 03/18/2008 REFUELING OUTAGE 500 KV TRINITY LINE OOS UNTIL 6/9/08 *  
Brunswick 1 100        
Brunswick 2 70   REDUCED FOR MAINTENACE ON LEAKING STEAM VALVE *  
Catawba 1 0 05/03/2008 REFUELING OUTAGE    
Catawba 2 100        
Crystal River 3 100        
Farley 1 93   INCREASING POWER    
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 20   TURBINE ROLLUP IN PROGRESS *  
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 04/11/2008 REFUELING OUTAGE    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 05/04/2008 REFUELING OUTAGE    
Summer 0 04/25/2008 REFUELING OUTAGE DEFUELED    
Surry 1 100        
Surry 2 0 04/26/2008 REFUELING OUTAGE CORE RELOAD IN PROGRESS *  
Turkey Point 3 100        
Turkey Point 4 2   INCREASING POWER *  
Vogtle 1 100        
Vogtle 2 98   100% ELECTRICAL CAPABILITY    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 0 04/20/2008 REFUELING OUTAGE    
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 97   TURBINE STOP AND CONTROL VALVE TESTING *  
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY *  
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 96   INCREASING POWER AFTER TURBINE VALVE TESTING *  
Kewaunee 50   HOLDING POWER FOR FLUX MAPPING AND NI ADJUSTMENTS *  
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 20   HOLDING POWER FOR SOAK *  
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 46   ROD PATTERN ADJUSTMENT *  
Quad Cities 2 97   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 04/11/2008 REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/19/2008 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 99   HIGH RATE BLOWDOWNS *  
Palo Verde 2 0 03/28/2008 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 84   INCREASING POWER *  
San Onofre 2 100        
San Onofre 3 0 04/16/2008 PLANNED SHUTDOWN - MAINTAINING UNIT IN HOT STANDBY    
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 04/26/2008 DEFUELED    
Wolf Creek 1 0 03/17/2008 PREPARING FOR STARTUP *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021