Power Reactor Status Report for April 5, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 10 | PERFORMING PLANT S/D FOR EMERGENT LEAK ON FWH STRING. | * | ||
| Ginna | 100 | ||||
| Hope Creek 1 | 100 | 5021 LINE (500KV) AT SALEM IS OOS WHICH IMPOSES CONTINGENCIES ON HOPE CREEK | * | ||
| Indian Point 2 | 0 | 03/23/2008 | REFUELING OUTAGE - DEFUELED FEEDERS 95332 AND 95891 OOS FOR SCHEDULED MAINTENANCE. | * | |
| Indian Point 3 | 100 | FEEDERS 95332 AND 95891 OOS FOR SCHEDULED MAINTENANCE. | * | ||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
| Millstone 3 | 90 | REDUCED POWER FOR PLANNED MAINTENANCE ACTIVITIES | * | ||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 0 | 03/21/2008 | REFUELING OUTAGE | ||
| Oyster Creek | 92 | HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES | * | ||
| Peach Bottom 2 | 85 | INCREASING POWER AFTER SCHEDULED LOAD DROP | * | ||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 30 | PERFORMING PLANT SHUTDOWN FOR PLANNED MAINTENANCE OUTAGE. | * | ||
| Salem 1 | 100 | 500 KV LINE OOS FOR MAINTENANCE | |||
| Salem 2 | 0 | 03/11/2008 | DEFUELED 500 KV LINE OOS FOR MAINTENANCE | ||
| Seabrook 1 | 0 | 03/31/2008 | REFUELING OUTAGE | ||
| Susquehanna 1 | 0 | 03/03/2008 | REFUELING OUTAGE | ||
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 97 | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 0 | 03/18/2008 | REFUELING OUTAGE | ||
| Brunswick 1 | 0 | 03/14/2008 | REFUELING OUTAGE | ||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | ||||
| Farley 1 | 100 | ||||
| Farley 2 | 95 | INCREASING POWER AFTER PLANNED MAINTENANCE | * | ||
| Harris 1 | 100 | ||||
| Hatch 1 | 93 | INCREASING POWER | * | ||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 0 | 03/01/2008 | REFUELING OUTAGE | ||
| North Anna 1 | 100 | 230 KV LINE 255 OOS 3/31 - 4/7 | |||
| North Anna 2 | 100 | 230 KV LINE 255 OOS 3/31 - 4/7 | |||
| Oconee 1 | 73 | HOLDING POWER UNTIL OUTAGE; 1A1 RCP SHUT DOWN | |||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 0 | 03/30/2008 | REFUELING OUTAGE | * | |
| Vogtle 1 | 0 | 03/15/2008 | DEFUELED - SWITCHYARD PROTECTIVE RELAY TESTING | ||
| Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY. SWITCHYARD PROTECTIVE RELAY TESTING | |||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 0 | 03/23/2008 | CORE RELOAD IN PROGRESS | ||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 0 | 03/25/2008 | REFUELING OUTAGE - DEFUELED | * | |
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY; 1 OF 2 SWITCHYARD BREAKERS TO GRID OOS ON 4/7 | * | ||
| Fermi 2 | 100 | ||||
| Kewaunee | 0 | 03/28/2008 | REFUELING OUTAGE | ||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 100 | * | |||
| Perry 1 | 0 | 04/03/2008 | PLANNED MAINTENANCE OUTAGE | * | |
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY | * |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 0 | 03/16/2008 | REFUELING OUTAGE | ||
| Callaway | 100 | * | |||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 0 | 03/29/2008 | REFUELING OUTAGE | ||
| Cooper | 85 | COASTDOWN TO REFUELING OUTAGE | |||
| Diablo Canyon 1 | 100 | * | |||
| Diablo Canyon 2 | 0 | 02/03/2008 | REFUELING OUTAGE | * | |
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 0 | 03/28/2008 | REFUELING OUTAGE | ||
| Palo Verde 3 | 100 | ||||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 99 | ||||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 0 | 03/29/2008 | REFUELING OUTAGE | ||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 0 | 03/17/2008 | REFUELING OUTAGE DEFUELED |