Power Reactor Status Report for April 5, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 10 | PERFORMING PLANT S/D FOR EMERGENT LEAK ON FWH STRING. | * | ||
Ginna | 100 | ||||
Hope Creek 1 | 100 | 5021 LINE (500KV) AT SALEM IS OOS WHICH IMPOSES CONTINGENCIES ON HOPE CREEK | * | ||
Indian Point 2 | 0 | 03/23/2008 | REFUELING OUTAGE - DEFUELED FEEDERS 95332 AND 95891 OOS FOR SCHEDULED MAINTENANCE. | * | |
Indian Point 3 | 100 | FEEDERS 95332 AND 95891 OOS FOR SCHEDULED MAINTENANCE. | * | ||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
Millstone 3 | 90 | REDUCED POWER FOR PLANNED MAINTENANCE ACTIVITIES | * | ||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 0 | 03/21/2008 | REFUELING OUTAGE | ||
Oyster Creek | 92 | HOLDING POWER FOR CONTROL VALVE OSCILLATION PROBLEM AND FEEDWATER HEATER ISSUES | * | ||
Peach Bottom 2 | 85 | INCREASING POWER AFTER SCHEDULED LOAD DROP | * | ||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 30 | PERFORMING PLANT SHUTDOWN FOR PLANNED MAINTENANCE OUTAGE. | * | ||
Salem 1 | 100 | 500 KV LINE OOS FOR MAINTENANCE | |||
Salem 2 | 0 | 03/11/2008 | DEFUELED 500 KV LINE OOS FOR MAINTENANCE | ||
Seabrook 1 | 0 | 03/31/2008 | REFUELING OUTAGE | ||
Susquehanna 1 | 0 | 03/03/2008 | REFUELING OUTAGE | ||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 97 | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 0 | 03/18/2008 | REFUELING OUTAGE | ||
Brunswick 1 | 0 | 03/14/2008 | REFUELING OUTAGE | ||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 95 | INCREASING POWER AFTER PLANNED MAINTENANCE | * | ||
Harris 1 | 100 | ||||
Hatch 1 | 93 | INCREASING POWER | * | ||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 0 | 03/01/2008 | REFUELING OUTAGE | ||
North Anna 1 | 100 | 230 KV LINE 255 OOS 3/31 - 4/7 | |||
North Anna 2 | 100 | 230 KV LINE 255 OOS 3/31 - 4/7 | |||
Oconee 1 | 73 | HOLDING POWER UNTIL OUTAGE; 1A1 RCP SHUT DOWN | |||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 0 | 03/30/2008 | REFUELING OUTAGE | * | |
Vogtle 1 | 0 | 03/15/2008 | DEFUELED - SWITCHYARD PROTECTIVE RELAY TESTING | ||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY. SWITCHYARD PROTECTIVE RELAY TESTING | |||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 0 | 03/23/2008 | CORE RELOAD IN PROGRESS | ||
Byron 2 | 100 | ||||
Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 0 | 03/25/2008 | REFUELING OUTAGE - DEFUELED | * | |
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY; 1 OF 2 SWITCHYARD BREAKERS TO GRID OOS ON 4/7 | * | ||
Fermi 2 | 100 | ||||
Kewaunee | 0 | 03/28/2008 | REFUELING OUTAGE | ||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | * | |||
Perry 1 | 0 | 04/03/2008 | PLANNED MAINTENANCE OUTAGE | * | |
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 0 | 03/16/2008 | REFUELING OUTAGE | ||
Callaway | 100 | * | |||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 0 | 03/29/2008 | REFUELING OUTAGE | ||
Cooper | 85 | COASTDOWN TO REFUELING OUTAGE | |||
Diablo Canyon 1 | 100 | * | |||
Diablo Canyon 2 | 0 | 02/03/2008 | REFUELING OUTAGE | * | |
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 0 | 03/28/2008 | REFUELING OUTAGE | ||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | ||||
San Onofre 3 | 100 | ||||
South Texas 1 | 0 | 03/29/2008 | REFUELING OUTAGE | ||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 0 | 03/17/2008 | REFUELING OUTAGE DEFUELED |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021