Power Reactor Status Report for February 6, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
Limerick 2 | 0 | 02/01/2008 | TRANSFORMER MAINTENANCE OUTAGE | ||
Millstone 2 | 100 | SWITCHYARD WORK ON LINE 310 - TRIP RISK THIS UNIT | * | ||
Millstone 3 | 100 | SWITCHYARD WORK ON LINE 310 | * | ||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 92 | HOLDING POWER FOR TURBINE VALVE ISSUES | |||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 0 | 02/05/2008 | MAINTENANCE OUTAGE TO REPAIR 71D SRV. | * | |
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | * | |||
Susquehanna 1 | 100 | ||||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 98 | COASTDOWN TO REFUELING OUTAGE; LINE 24B OOS (1 OF 8 OFFSITE LINES) | * | ||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 0 | 02/03/2008 | REFUELING OUTAGE | ||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 02/01/2008 | RCP MAINTENANCE | ||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 0 | 01/29/2008 | MAINTENANCE ON RCPS | ||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Watts Bar 1 | 85 | INCREASING POWER FOLLOWING REPAIR OF MSR C2 RELIEF VALVE | * |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 29 | INCREASING POWER | * | ||
D.C. Cook 1 | 48 | INCREASING POWER | * | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 0 | 02/05/2008 | HOLDING POWER WHILE REPAIRING MG ROTOR | * | |
Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 97 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY. | |||
Fermi 2 | 100 | * | |||
Kewaunee | 100 | ||||
La Salle 1 | 0 | 02/03/2008 | REFUELING OUTAGE | * | |
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | * | |||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 89 | COASTDOWN TO REFUELING OUTAGE BUS 2 OOS FOR MAINTENANCE | |||
Prairie Island 2 | 100 | BUS 2 OOS FOR MAINTENANCE | |||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 37 | TWO PLEASANT HILL LINES OOS: (1) 500 KV RING BUS AND (1) 161 KV LINE DUE TO STORM WEATHER. SYSTEM OPERATOR REQUESTED REDUCE OUTPUT TO 1300 MW(E) | * | ||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | RECIRC PUMPS IN MANUAL | |||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 0 | 02/03/2008 | REFUELING OUTAGE | ||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 0 | 01/06/2008 | DEFUELED | ||
San Onofre 2 | 98 | ADMINISTRATIVE LIMIT BASED ON STEAM GENERATOR LIMITATIONS | |||
San Onofre 3 | 65 | HOLDING POWER FOR MAIN FEEDPUMP TURBINE REPAIR | |||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021