The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for January 12, 2008

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100   COASTDOWN TO REFUELING OUTAGE TWO FEED WATER HEATERS OUT OF SERVICE    
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 69   HOLDING POWER INDEFINITELY DUE TO TURBINE CONTROL VALVE ISSUE SERVICE WATER SYSTEM LEAK *  
Peach Bottom 2 84   INCREASING POWER *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100     *  
Browns Ferry 2 100     *  
Browns Ferry 3 0 01/09/2008 PLANNED SHUTDOWN FOR GENERATOR EXCITER REPAIR *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 94   TURBINE VALVE TESTING *  
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 97   100% ELECTRICAL CAPABILITY    
Vogtle 2 98   100% ELECTRICAL CAPABILITY    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100     *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 0 01/11/2008 REFUELING OUTAGE *  
D.C. Cook 1 100        
D.C. Cook 2 55   REDUCED POWER FOR PLANNED MAINTENANCE ON THE WEST FEED PUMP *  
Davis-Besse 0 12/29/2007 REFUELING OUTAGE - DEFUELED    
Dresden 2 97   100% ELECTRICAL CAPABILITY    
Dresden 3 0 01/09/2008 PLANNED MAINTENANCE OUTAGE.    
Duane Arnold 98   100% ELECTRICAL CAPABILITY.    
Fermi 2 100        
Kewaunee 100        
La Salle 1 80   COASTDOWN TO REFUELING OUTAGE    
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100   PLANNED TRANSFORMER MAINTENANCE    
Prairie Island 2 100   PLANNED TRANSFORMER MAINTENANCE    
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 97   100% ELECTRICAL CAPABILITY *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100   PLANNED MAINTENANCE ON THE STARTUP TRANSFORMER SCHEDULED TO BEGIN ON 1/14/08. *  
Palo Verde 2 100   PLANNED MAINTENANCE ON THE STARTUP TRANSFORMER SCHEDULED TO BEGIN ON 1/14/08. *  
Palo Verde 3 0 09/29/2007 EXITING REFUELING OUTAGE. PLANNED MAINTENANCE ON THE STARTUP TRANSFORMER SCHEDULED TO BEGIN ON 1/14/08. *  
River Bend 1 0 01/06/2008 REFUELING OUTAGE    
San Onofre 2 0 11/26/2007 REFUELING OUTAGE    
San Onofre 3 98   INCREASING POWER AFTER PERFORMING TURBINE GOVERNOR VALVE TESTING. *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 01/11/2008 TECH SPEC REQUIRED S/D. SEE EVENT NO. 43895 *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021