Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 98 | CROSS FLOW DATA ACQUISITION IN PROGRESS. | |||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | GENERATOR VOLTAGE REGULATOR IN MANUAL | |||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | 345 KV LINE MAINTENANCE AND SWITCHYARD WORK TO BE PERFORMED ON DAY SHIFT ONLY FOR THE NEXT SEVERAL DAYS. | |||
Millstone 3 | 100 | 345 KV LINE MAINTENANCE AND SWITCHYARD WORK TO BE PERFORMED ON DAY SHIFT ONLY FOR THE NEXT SEVERAL DAYS. | |||
Nine Mile Point 1 | 100 | PERFORMING MAINTENANCE ON 345KV LINE (LINE 8, NOT COMMON TO UNIT 2) | * | ||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | 4 RECIRC LOOP OPERATION, 'C' RECIRC PUMP SEAL FAILURE. | |||
Peach Bottom 2 | 100 | STARTUP SOURCE 343 OOS | |||
Peach Bottom 3 | 100 | STARTUP SOURCE 343 OOS | |||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | NEPOOL CONTINGENCY MEASURES MAY BE NEEDED DUE TO STORM IN THE AREA POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY | * | ||
Susquehanna 1 | 100 | * | |||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 0 | 11/30/2007 | PLANNED MIDCYCLE OUTAGE | ||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 0 | 11/02/2007 | REFUELING OUTAGE | * | |
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 0 | 10/26/2007 | FUEL RELOAD IN PROGRESS | * | |
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 0 | 09/30/2007 | FUEL RELOAD COMPLETE | ||
Sequoyah 1 | 100 | SCHEDULED MAINTENANCE WILL RESULT IN OFFSITE POWER VULNERABILITY | * | ||
Sequoyah 2 | 100 | SCHEDULED MAINTENANCE WILL RESULT IN OFFSITE POWER VULNERABILITY | * | ||
Summer | 100 | ||||
Surry 1 | 100 | * | |||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | COASTDOWN TO REFUELING OUTAGE | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 87 | COASTDOWN TO REFUELING OUTAGE | * | ||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 0 | 11/28/2007 | FORCED OUTAGE. SEE EVENT #43808 | ||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | OFFSITE SOURCE 345 KV LINE (CAL BLAND 1) OOS | |||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | PREPARING TO RAMP POWER DOWN TO 24 % IN ANTICIPATION OF AN APPROACHING OCEAN STORM | * | ||
Diablo Canyon 2 | 52 | CURRENTLY RAMPING POWER DOWN TO 24 % IN ANTICIPATION OF AN APPROACHING OCEAN STORM | * | ||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 0 | 09/29/2007 | DEFUELED | ||
River Bend 1 | 90 | HOLDING FOR SCHEDULED MAINTENANCE | |||
San Onofre 2 | 0 | 11/26/2007 | REFUELING OUTAGE. | ||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |