The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 3, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 55   HOLDING FOR FEED PUMP MAINTENANCE *  
Ginna 100        
Hope Creek 1 0 10/13/2007 REFUELING OUTAGE    
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100   SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES)    
Millstone 3 100   SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES)    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100   LINE 342 AT PARTIAL CAPACITY    
Salem 1 100        
Salem 2 100        
Seabrook 1 100   307 LINE OOS (1 OF 3), POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY    
Susquehanna 1 100     *  
Susquehanna 2 100   VOLTAGE REGULATOR IN MANUAL    
Three Mile Island 1 0 10/21/2007 DEFUELED *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 37   NOBLE METALS INJECTION, 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE *  
Browns Ferry 2 100   1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE *  
Browns Ferry 3 100   1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 0 09/14/2007 REFUELING    
Crystal River 3 0 11/02/2007 REFUELING OUTAGE *  
Farley 1 0 09/28/2007 REFUELING OUTAGE    
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 93   INCREASING POWER, SWITCHYARD WORK *  
McGuire 1 100        
McGuire 2 90   TURBINE VALVE TESTING *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 10/26/2007 REFUELING OUTAGE *  
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 09/30/2007 DEFUELED    
Sequoyah 1 0 10/03/2007 REFUELING OUTAGE    
Sequoyah 2 100        
Summer 100        
Surry 1 0 10/20/2007 DEFUELED    
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 97   100% ELECTRICAL CAPABILITY    
Vogtle 2 98   100% ELECTRICAL CAPABILITY    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 75   COMPLETING 24 HOUR HOLD FOR FUEL PRE-CONDITIONING *  
Braidwood 2 100        
Byron 1 100     *  
Byron 2 100     *  
Clinton 93   INCREASING POWER *  
D.C. Cook 1 100        
D.C. Cook 2 0 09/14/2007 REFUELING OUTAGE *  
Davis-Besse 100        
Dresden 2 0 10/28/2007 REFUELING OUTAGE, SWITCHYARD WORK    
Dresden 3 99   100% ELECTRICAL CAPABILITY *  
Duane Arnold 98   100% ELECTRICAL CAPABILITY *  
Fermi 2 0 09/29/2007 REFUELING OUTAGE *  
Kewaunee 100        
La Salle 1 95   COASTDOWN TO REFUELING OUTAGE    
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100   345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK *  
Prairie Island 2 100   345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK *  
Quad Cities 1 96   100% ELECTRICAL CAPABILITY *  
Quad Cities 2 97   100% ELECTRICAL CAPABILITY *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 70   REDUCED POWER FOR PLANNED MAINTENANCE - ANTICIPATE INCREASING POWER AT 1300 HRS TODAY *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 12   MAIN GENERATOR OFFLINE - UE DECLARED DUE TO SUSPICIOUS EXPLOSIVE DEVICE FOUND IN VEHICLE AT OCA CHECKPOINT - SEE EN #43764 *  
Palo Verde 2 100   UE DECLARED DUE TO SUSPICIOUS EXPLOSIVE DEVICE FOUND IN VEHICLE AT OCA CHECKPOINT - SEE EN #43764 *  
Palo Verde 3 0 09/29/2007 DEFUELED - UE DECLARED DUE TO SUSPICIOUS EXPLOSIVE DEVICE FOUND IN VEHICLE AT OCA CHECKPOINT - SEE EN #43764 *  
River Bend 1 45   HOLDING POWER PENDING REPAIR OF REACTOR FEED PUMP "B" SEAL *  
San Onofre 2 96   S/G LIMITATIONS    
San Onofre 3 0 10/09/2007 MAINTENANCE OUTAGE    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021