Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 55 | HOLDING FOR FEED PUMP MAINTENANCE | * | ||
Ginna | 100 | ||||
Hope Creek 1 | 0 | 10/13/2007 | REFUELING OUTAGE | ||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES) | |||
Millstone 3 | 100 | SWITCH YARD WORK - HIGH REACTOR TRIP RISK, LINE 383 OOS ( 1 OF 4 OFFSITE SOURCES) | |||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | LINE 342 AT PARTIAL CAPACITY | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | 307 LINE OOS (1 OF 3), POWER REDUCTION THREAT DUE TO GRID WORK IN NEW YORK UNTIL JANUARY | |||
Susquehanna 1 | 100 | * | |||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 0 | 10/21/2007 | DEFUELED | * | |
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 37 | NOBLE METALS INJECTION, 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE | * | ||
Browns Ferry 2 | 100 | 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE | * | ||
Browns Ferry 3 | 100 | 1 OF 7 500 KV TRANSMISSION LINES OOS FOR MAINTENANCE | * | ||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 0 | 09/14/2007 | REFUELING | ||
Crystal River 3 | 0 | 11/02/2007 | REFUELING OUTAGE | * | |
Farley 1 | 0 | 09/28/2007 | REFUELING OUTAGE | ||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 93 | INCREASING POWER, SWITCHYARD WORK | * | ||
McGuire 1 | 100 | ||||
McGuire 2 | 90 | TURBINE VALVE TESTING | * | ||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 0 | 10/26/2007 | REFUELING OUTAGE | * | |
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 0 | 09/30/2007 | DEFUELED | ||
Sequoyah 1 | 0 | 10/03/2007 | REFUELING OUTAGE | ||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 0 | 10/20/2007 | DEFUELED | ||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 75 | COMPLETING 24 HOUR HOLD FOR FUEL PRE-CONDITIONING | * | ||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | * | |||
Byron 2 | 100 | * | |||
Clinton | 93 | INCREASING POWER | * | ||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 0 | 09/14/2007 | REFUELING OUTAGE | * | |
Davis-Besse | 100 | ||||
Dresden 2 | 0 | 10/28/2007 | REFUELING OUTAGE, SWITCHYARD WORK | ||
Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | * | ||
Fermi 2 | 0 | 09/29/2007 | REFUELING OUTAGE | * | |
Kewaunee | 100 | ||||
La Salle 1 | 95 | COASTDOWN TO REFUELING OUTAGE | |||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | 345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK | * | ||
Prairie Island 2 | 100 | 345KV BUS "2" OOS FOR PLANNED MAINTENANCE STARTING 11/3 FOR APPROXIMATELY 1 WEEK | * | ||
Quad Cities 1 | 96 | 100% ELECTRICAL CAPABILITY | * | ||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 70 | REDUCED POWER FOR PLANNED MAINTENANCE - ANTICIPATE INCREASING POWER AT 1300 HRS TODAY | * | ||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 12 | MAIN GENERATOR OFFLINE - UE DECLARED DUE TO SUSPICIOUS EXPLOSIVE DEVICE FOUND IN VEHICLE AT OCA CHECKPOINT - SEE EN #43764 | * | ||
Palo Verde 2 | 100 | UE DECLARED DUE TO SUSPICIOUS EXPLOSIVE DEVICE FOUND IN VEHICLE AT OCA CHECKPOINT - SEE EN #43764 | * | ||
Palo Verde 3 | 0 | 09/29/2007 | DEFUELED - UE DECLARED DUE TO SUSPICIOUS EXPLOSIVE DEVICE FOUND IN VEHICLE AT OCA CHECKPOINT - SEE EN #43764 | * | |
River Bend 1 | 45 | HOLDING POWER PENDING REPAIR OF REACTOR FEED PUMP "B" SEAL | * | ||
San Onofre 2 | 96 | S/G LIMITATIONS | |||
San Onofre 3 | 0 | 10/09/2007 | MAINTENANCE OUTAGE | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |