Power Reactor Status Report for October 6, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 0 | 09/23/2007 | DEFUELED REFUELING OUTAGE | ||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 90 | COASTDOWN TO REFUELING OUTAGE. 500 KV INFEED LINE (5023) OOS | |||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 0 | 09/23/2007 | REFUELING OUTAGE | ||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | 500 KV HOPE CREEK TIE LINE (5023) OOS TILL 10/9 | |||
Salem 2 | 100 | 500 KV HOPE CREEK TIE LINE (5023) OOS TILL 10/9 | |||
Seabrook 1 | 100 | POWER REDUCTION THREAT DUE TO GRID WORK IN NEW ENGLAND UNTIL JANUARY | |||
Susquehanna 1 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
Vermont Yankee | 86 | DOWNPOWER DUE TO LIMITED HOTWELL TEMP TO CONTROL COPPER CONTENT AND RIVER TEMPERATURE INCREASE | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | ||||
Browns Ferry 2 | 100 | ||||
Browns Ferry 3 | 100 | ||||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 0 | 09/14/2007 | DEFUELED | ||
Crystal River 3 | 100 | ||||
Farley 1 | 0 | 09/28/2007 | REFUELING OUTAGE | ||
Farley 2 | 27 | HOLDING POWER FOR NI CAL | * | ||
Harris 1 | 0 | 09/28/2007 | REFUELING OUTAGE. | ||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 0 | 09/08/2007 | REFUELING OUTAGE | ||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | * | |||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 0 | 09/30/2007 | REFUELING OUTAGE | ||
Sequoyah 1 | 0 | 10/03/2007 | REFUELING OUTAGE | ||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 0 | 09/02/2007 | REFUELING OUTAGE | ||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 0 | 10/01/2007 | REFUELING OUTAGE | * | |
Braidwood 2 | 100 | ||||
Byron 1 | 100 | * | |||
Byron 2 | 100 | SYSTEM AUX TRANSFORMER (242) OFFLINE FOR PLANNED MAINTENANCE | * | ||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 0 | 09/14/2007 | DEFUELED | ||
Davis-Besse | 100 | ||||
Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 100 | ||||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 0 | 09/29/2007 | REFUELING OUTAGE. PLANNED MAINTENANCE ON 345 KV BROWNSTOWN LINES 2 AND 3 STARTING 9/30/07. | ||
Kewaunee | 0 | 10/04/2007 | PLANNED SHUTDOWN TO REPAIR LEAKING HYDROGEN COOLERS IN THE MAIN GENERATOR | * | |
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 0 | 09/09/2007 | REFUELING OUTAGE | ||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 72 | AT 0500 ON 10/6/07 BUS SECTION 3-4 WILL BE REMOVED FROM SERVICE. UNIT 2 WILL DOWNPOWER TO 50% | * | ||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 0 | 09/29/2007 | REFUELING OUTAGE | ||
River Bend 1 | 84 | INCREASING POWER | * | ||
San Onofre 2 | 98 | INCREASING POWER STEAM GENERATOR LIMITATIONS | * | ||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |