Power Reactor Status Report for October 4, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 0 | 09/23/2007 | DEFUELED REFUELING OUTAGE | ||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | ||||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 94 | INCREASING POWER FOLLOWING REPAIR OF CONDENSER TUBE LEAK | * | ||
| Ginna | 100 | ENTERING 7 DAY LCO FOR ONE OFFSITE LINE OOS WHILE TESTING BREAKER | * | ||
| Hope Creek 1 | 91 | COASTDOWN TO REFUELING OUTAGE. 500 KV INFEED LINE (5023) OOS | |||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | ||||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 100 | ||||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 0 | 09/23/2007 | REFUELING OUTAGE | ||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | 500 KV HOPE CREEK TIE LINE (5023) OOS TILL 10/9 | |||
| Salem 2 | 100 | 500 KV HOPE CREEK TIE LINE (5023) OOS TILL 10/9 | |||
| Seabrook 1 | 100 | POWER REDUCTION THREAT DUE TO GRID WORK IN NEW ENGLAND UNTIL JANUARY | |||
| Susquehanna 1 | 100 | VOLTAGE REGULATOR IN MANUAL T-10 LINE HAS ONE FEED OOS | |||
| Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL T-10 LINE HAS ONE FEED OOS | |||
| Three Mile Island 1 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Vermont Yankee | 92 | DOWNPOWER AS THE RESULT OF ELEVATED RIVER WATER TEMPERATURES AFFECTING CONDENSER VACUUM | * |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 100 | ||||
| Browns Ferry 2 | 100 | ||||
| Browns Ferry 3 | 100 | ||||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 100 | ||||
| Catawba 1 | 100 | ||||
| Catawba 2 | 0 | 09/14/2007 | DEFUELED | ||
| Crystal River 3 | 100 | ||||
| Farley 1 | 0 | 09/28/2007 | REFUELING OUTAGE | ||
| Farley 2 | 0 | 10/03/2007 | REACTOR TRIP. SEE EN# 43687 | * | 1 |
| Harris 1 | 0 | 09/28/2007 | REFUELING OUTAGE. | ||
| Hatch 1 | 100 | ||||
| Hatch 2 | 100 | ||||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 0 | 09/08/2007 | REFUELING OUTAGE | ||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | ||||
| Oconee 2 | 100 | ||||
| Oconee 3 | 100 | ||||
| Robinson 2 | 99 | HOLDING POWER DUE TO TROUBLESHOOTING OF NI PROBLEM DURING NI CHANNEL CALIBRATION | * | ||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 0 | 09/30/2007 | REFUELING OUTAGE | ||
| Sequoyah 1 | 0 | 10/03/2007 | REFUELING OUTAGE | * | |
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 0 | 09/02/2007 | REFUELING OUTAGE | ||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 0 | 10/01/2007 | REFUELING OUTAGE | ||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 0 | 09/14/2007 | DEFUELED | ||
| Davis-Besse | 100 | ||||
| Dresden 2 | 99 | ||||
| Dresden 3 | 100 | ||||
| Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
| Fermi 2 | 0 | 09/29/2007 | REFUELING OUTAGE. PLANNED MAINTENANCE ON 345 KV BROWNSTONE LINE STARTING 9/30/07. | ||
| Kewaunee | 100 | ||||
| La Salle 1 | 100 | ||||
| La Salle 2 | 100 | ||||
| Monticello | 100 | ||||
| Palisades | 0 | 09/09/2007 | REFUELING OUTAGE | ||
| Perry 1 | 100 | ||||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 100 | ||||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | MOROBAY MIDWAY 230 KV LINE OUTAGE AT 0800 0N 10/4/07 | |||
| Diablo Canyon 2 | 100 | MOROBAY MIDWAY 230 KV LINE OUTAGE AT 0800 0N 10/4/07 | |||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 100 | ||||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 0 | 09/29/2007 | REFUELING OUTAGE | ||
| River Bend 1 | 1 | IN SOURCE RANGE | * | ||
| San Onofre 2 | 99 | STEAM GENERATOR LIMITATIONS | |||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |