Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 93 | COASTDOWN TO REFUELING OUTAGE | * | ||
Pilgrim 1 | 79 | DOWNPOWER TO 50% FOR MAIN CONDENSER BACKWASH. CURRENTLY HOLDING POWER TO TROUBLESHOOT FW PUMP ISSUE. | * | ||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL. | |||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 51 | REDUCED POWER DUE TO COOLING TOWER DAMAGE. LICENSEE EXPECTS A ONE TO TWO WEEK REPAIR TIME. |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 100 | * | |||
Browns Ferry 2 | 94 | HOLDING POWER WHILE REPAIRING CIRC WATER PUMP MOTOR | * | ||
Browns Ferry 3 | 100 | * | |||
Brunswick 1 | 100 | * | |||
Brunswick 2 | 100 | * | |||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | * | |||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 0 | 08/18/2007 | EXITING OUTAGE | ||
Sequoyah 1 | 100 | * | |||
Sequoyah 2 | 100 | * | |||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 100 | * | |||
Vogtle 2 | 100 | * | |||
Watts Bar 1 | 99 | CONDENSER BACK PRESSURE CONCERNS | * |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 99 | * | |||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | * | ||
Fermi 2 | 100 | ON 8/28 1 OF 3 (120 KV) OFFSITE DIVISION 1 FEEDS OOS FOR PLANNED MAINTENANCE FOR ONE DAY | |||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | 345 KV LINE OOS | * | ||
Point Beach 2 | 100 | 345 KV LINE OOS | * | ||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 98 | 100% ELECTRICAL CAPABILITY. | |||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY. |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ON 8/28 230 KV LINE (START-UP POWER) OOS FOR PLANNED MAINTENANCE FOR ONE DAY. THIS IS A BACKUP LINE NOT A MAIN XMISSION (500 KV) LINE | |||
Diablo Canyon 2 | 100 | ON 8/28 230 KV LINE (START-UP POWER) OOS FOR PLANNED MAINTENANCE FOR ONE DAY. THIS IS A BACKUP LINE NOT A MAIN XMISSION (500 KV) LINE | |||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 60 | HOLDING POWER FOLLOWING "B" RX RECIRC PUMP TRIP. LICENSEE IS TROUBLESHOOTING PROBLEM | * | ||
Palo Verde 1 | 100 | * | |||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | STEAM GENERATOR LIMITATIONS | |||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |