Power Reactor Status Report for August 17, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 22 | REDUCED POWER TO REPAIR A HOT SPOT ON THE MAIN GENERATOR DISCONNECT. MAIN GENERATOR OFFLINE. REPAIRS ARE COMPLETE. SYNC TO GRID ESTIMATED BETWEEN 0500 TO 0600. FULL POWER ESTIMATED BY 2000. | * | ||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 90 | DOWNPOWER MANEUVER IN PROGRESS TO 65% RX POWER DUE TO POTENTIAL FUEL LEAK AND SUPPRESSION TESTING | * | ||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Susquehanna 2 | 100 | VOLTAGE REGULATOR IN MANUAL | |||
Three Mile Island 1 | 100 | * | |||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 75 | REDUCED POWER DUE TO RIVER DISCHARGE TEMPERATURE LIMIT. POWER SUPPLY ALERT | * | ||
Browns Ferry 2 | 0 | 08/16/2007 | MAINTENANCE OUTAGE. COOLDOWN IN PROGRESS. 2A CONDENSER CIRCULATING WATER PUMP OOS - POWER SUPPLY ALERT | * | |
Browns Ferry 3 | 75 | REDUCED POWER DUE TO RIVER DISCHARGE TEMPERATURE LIMIT. POWER SUPPLY ALERT | * | ||
Brunswick 1 | 100 | RELIABILITY ALERT | * | ||
Brunswick 2 | 100 | RELIABILITY ALERT | * | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | POTENTIAL RELIABILITY ALERT AT 0900 | * | ||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 90 | HOLDING POWER TO REPAIR "1A" HEATER DRAIN PUMP DISCHARGE VALVE | * | ||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ALERT 1 DUE TO SYSTEM LOAD | |||
Sequoyah 2 | 100 | ALERT 1 DUE TO SYSTEM LOAD | |||
Summer | 100 | ||||
Surry 1 | 100 | * | |||
Surry 2 | 100 | * | |||
Turkey Point 3 | 100 | ANTICIPATE HIGH SYSTEM LOAD | |||
Turkey Point 4 | 100 | ANTICIPATE HIGH SYSTEM LOAD | |||
Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY - ANTICIPATE HIGH HEAT LOAD | * | ||
Vogtle 2 | 98 | 100% ELECTRICAL CAPABILITY - ANTICIPATE HIGH HEAT LOAD | * | ||
Watts Bar 1 | 97 | CONDENSER BACK PRESSURE CONCERNS; POWER SUPPLY/TRANSMISSION ALERT | * |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 100 | ||||
Dresden 3 | 100 | ||||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 98 | TESTING IN PROGRESS | * | ||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 99 | 100% ELECTRICAL CAPABILITY. | |||
Quad Cities 2 | 98 | 100% ELECTRICAL CAPABILITY. |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 98 | MAIN CONDENSER VALVE WORK CONTINUES. REDUCED POWER FOR TESTING | * | ||
Diablo Canyon 1 | 2 | HOLDING POWER FOR MAIN FEEDWATER PUMP PROBLEM | * | ||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | STEAM GENERATOR CONSTRAINTS | |||
San Onofre 3 | 99 | * | |||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |