Power Reactor Status Report for June 2, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 70 | INCREASING POWER | * | ||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | * | |||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | Z52 34.5KV LINE OOS | * | ||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 18 | REDUCING POWER TO 12% TO FURTHER INVESTIGATE MAIN TURBINE SEAL OIL PRESSURE PROBLEM. | * | ||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | ||||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 100 | 230 KV LINE 1051 OOS FOR MAINTENANCE UNTIL 6/11/07 | |||
Vermont Yankee | 0 | 05/13/2007 | REFUELING OUTAGE |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 21 | HOLDING FOR TESTING MADISON-1 500 KV LINE OOS UNTIL 2JUN07 | * | ||
Browns Ferry 2 | 100 | MADISON-1 500 KV LINE OOS UNTIL 2JUN07 | |||
Browns Ferry 3 | 100 | MADISON-1 500 KV LINE OOS UNTIL 2JUN07 | |||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 45 | HOLDING POWER FOR SECONDARY PLANT CONCERNS | |||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | * | |||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | * | |||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY. | |||
Vogtle 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 91 | REDUCED POWER FOR MAIN TURBINE CONTROL VALVE TESTING AND CIRC WATERBOX FLUSHING | * | ||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | OFFSITE SWITCHING WILL REDUCE POWER TO SINGLE 356KV LEMOYNE LINE | * | ||
Dresden 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 100 | 99% ELECTRICAL CAPABILITY | * | ||
Duane Arnold | 96 | HOLDING POWER FOR XENON | * | ||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 97 | HOLDING FOR HEAT BALANCE ISSUES WITH FEEDWATER FLOW VENTURIES | |||
Point Beach 1 | 100 | WILL REMOVE UNIT 1 X03 (345KV TO 13.8KV) STATION TRANSFORMER FROM SERVICE FOR PLANNED MAINTENANCE | * | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | * | ||
Quad Cities 2 | 97 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | * | |||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 0 | 05/12/2007 | REFUELING OUTAGE | ||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 93 | HOLDING POWER FOR FLUX MAPPING - DIGITAL FEEDWATER TESTING WILL BE PERFORMED AFTER INCREASE TO 100% POWER | * | ||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 0 | 05/18/2007 | DEFUELED | * | |
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 40 | CONDENSER TUBE REPAIRS COMPLETED - PREPARING TO INCREASE POWER | * | ||
River Bend 1 | 0 | 05/22/2007 | FORCED OUTAGE - SHUTDOWN TO INVESTIGATE AND REPAIR 'A' RECIRC PUMP DISCHARGE VALVE MALFUNCTION | ||
San Onofre 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
San Onofre 3 | 96 | REDUCED POWER FOR TURBINE VALVE TESTING | * | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021