The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for June 2, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 70   INCREASING POWER *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100     *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100   Z52 34.5KV LINE OOS *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 18   REDUCING POWER TO 12% TO FURTHER INVESTIGATE MAIN TURBINE SEAL OIL PRESSURE PROBLEM. *  
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100   230 KV LINE 1051 OOS FOR MAINTENANCE UNTIL 6/11/07    
Vermont Yankee 0 05/13/2007 REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 21   HOLDING FOR TESTING MADISON-1 500 KV LINE OOS UNTIL 2JUN07 *  
Browns Ferry 2 100   MADISON-1 500 KV LINE OOS UNTIL 2JUN07    
Browns Ferry 3 100   MADISON-1 500 KV LINE OOS UNTIL 2JUN07    
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 45   HOLDING POWER FOR SECONDARY PLANT CONCERNS    
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100     *  
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100     *  
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98   100% ELECTRICAL CAPABILITY.    
Vogtle 2 99   100% ELECTRICAL CAPABILITY    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 91   REDUCED POWER FOR MAIN TURBINE CONTROL VALVE TESTING AND CIRC WATERBOX FLUSHING *  
D.C. Cook 2 100        
Davis-Besse 100   OFFSITE SWITCHING WILL REDUCE POWER TO SINGLE 356KV LEMOYNE LINE *  
Dresden 2 99   100% ELECTRICAL CAPABILITY    
Dresden 3 100   99% ELECTRICAL CAPABILITY *  
Duane Arnold 96   HOLDING POWER FOR XENON *  
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 97   HOLDING FOR HEAT BALANCE ISSUES WITH FEEDWATER FLOW VENTURIES    
Point Beach 1 100   WILL REMOVE UNIT 1 X03 (345KV TO 13.8KV) STATION TRANSFORMER FROM SERVICE FOR PLANNED MAINTENANCE *  
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY *  
Quad Cities 2 97   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100     *  
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 0 05/12/2007 REFUELING OUTAGE    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 93   HOLDING POWER FOR FLUX MAPPING - DIGITAL FEEDWATER TESTING WILL BE PERFORMED AFTER INCREASE TO 100% POWER *  
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 0 05/18/2007 DEFUELED *  
Palo Verde 2 100        
Palo Verde 3 40   CONDENSER TUBE REPAIRS COMPLETED - PREPARING TO INCREASE POWER *  
River Bend 1 0 05/22/2007 FORCED OUTAGE - SHUTDOWN TO INVESTIGATE AND REPAIR 'A' RECIRC PUMP DISCHARGE VALVE MALFUNCTION    
San Onofre 2 99   100% ELECTRICAL CAPABILITY    
San Onofre 3 96   REDUCED POWER FOR TURBINE VALVE TESTING *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021