Power Reactor Status Report for May 15, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Beaver Valley 1 | 100 | | | | |
Beaver Valley 2 | 100 | | | | |
Calvert Cliffs 1 | 100 | | 500KV LINE 5051 OOS FOR 05/15 | * | |
Calvert Cliffs 2 | 100 | | 500KV LINE 5051 OOS FOR 05/15 | * | |
FitzPatrick | 100 | | | | |
Ginna | 67 | | OFFSITE SWITCHYARD MAINTENANCE | * | |
Hope Creek 1 | 100 | | | | |
Indian Point 2 | 100 | | MAINTENANCE ON FEEDER 95891 | | |
Indian Point 3 | 100 | | MAINTENANCE ON FEEDER 95891 | | |
Limerick 1 | 100 | | | | |
Limerick 2 | 100 | | | | |
Millstone 2 | 100 | | | | |
Millstone 3 | 0 | 04/07/2007 | REFUELING OUTAGE | * | |
Nine Mile Point 1 | 100 | | 345 KV LINE 8 MAINT 5/14-17 | | |
Nine Mile Point 2 | 100 | | | | |
Oyster Creek | 100 | | | | |
Peach Bottom 2 | 100 | | | | |
Peach Bottom 3 | 100 | | | | |
Pilgrim 1 | 100 | | MAINTENANCE ON 345KV LINE 342 BETWEEN 0800 & 1600 HOURS | * | |
Salem 1 | 100 | | | | |
Salem 2 | 100 | | | | |
Seabrook 1 | 100 | | SWITCHYARD BREAKER 169 OOS UNTIL 23MAY07. 345KV NEWINGTON LINE 369 OOS UNTIL 5/17. | * | |
Susquehanna 1 | 100 | | | | |
Susquehanna 2 | 100 | | | | |
Three Mile Island 1 | 100 | | | | |
Vermont Yankee | 0 | 05/13/2007 | REFUELING OUTAGE | | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Browns Ferry 1 | 0 | 03/03/1985 | MAINTENANCE OUTAGE TAGOUT OF 500KV BUS 1 & 500KV TRINITY 1 | * | |
Browns Ferry 2 | 100 | | TAGOUT OF 500KV BUS 1 & 500KV TRINITY 1 | * | |
Browns Ferry 3 | 100 | | TAGOUT OF 500KV BUS 1 & 500KV TRINITY 1 | * | |
Brunswick 1 | 100 | | | | |
Brunswick 2 | 100 | | | | |
Catawba 1 | 100 | | | | |
Catawba 2 | 100 | | | | |
Crystal River 3 | 100 | | | | |
Farley 1 | 100 | | | | |
Farley 2 | 0 | 04/09/2007 | REFUELING OUTAGE - INVESTIGATING RCP SEAL | | |
Harris 1 | 100 | | | | |
Hatch 1 | 100 | | | | |
Hatch 2 | 100 | | | | |
McGuire 1 | 0 | 03/10/2007 | REFUELING OUTAGE. STUCK CONTROL ROD (H8) | | |
McGuire 2 | 100 | | | | |
North Anna 1 | 100 | | | | |
North Anna 2 | 100 | | | | |
Oconee 1 | 100 | | | | |
Oconee 2 | 0 | 04/27/2007 | REFUELING IN PROGRESS | | |
Oconee 3 | 100 | | | | |
Robinson 2 | 67 | | INCREASING POWER | * | |
Saint Lucie 1 | 0 | 04/01/2007 | REFUELING OUTAGE | | |
Saint Lucie 2 | 100 | | | | |
Sequoyah 1 | 100 | | | | |
Sequoyah 2 | 100 | | | | |
Summer | 100 | | | | |
Surry 1 | 100 | | | | |
Surry 2 | 100 | | | | |
Turkey Point 3 | 100 | | | | |
Turkey Point 4 | 100 | | | | |
Vogtle 1 | 98 | | 100% ELECTRICAL CAPABILITY. | | |
Vogtle 2 | 100 | | | | |
Watts Bar 1 | 100 | | 161KV HYDRO SWITCHYARD MAINTENANCE | | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Braidwood 1 | 100 | | | | |
Braidwood 2 | 100 | | | * | |
Byron 1 | 100 | | | | |
Byron 2 | 100 | | | * | |
Clinton | 97 | | 100% ELECTRICAL CAPABILITY | | |
D.C. Cook 1 | 100 | | | | |
D.C. Cook 2 | 100 | | | | |
Davis-Besse | 100 | | | | |
Dresden 2 | 98 | | 100% ELECTRICAL CAPABILITY | | |
Dresden 3 | 99 | | 100% ELECTRICAL CAPABILITY | * | |
Duane Arnold | 98 | | 100% ELECTRICAL CAPABILITY | | |
Fermi 2 | 100 | | | | |
Kewaunee | 100 | | | | |
La Salle 1 | 100 | | | | |
La Salle 2 | 100 | | | | |
Monticello | 100 | | | | |
Palisades | 60 | | INCREASING POWER | * | |
Perry 1 | 0 | 05/15/2007 | AUTOMATIC REACTOR SCRAM. SEE EVENT # 43363 | * | 1 |
Point Beach 1 | 100 | | | | |
Point Beach 2 | 100 | | | | |
Prairie Island 1 | 0 | 05/11/2007 | FEEDWATER PUMP REPAIR IN PROGRESS | | |
Prairie Island 2 | 100 | | | | |
Quad Cities 1 | 0 | 05/04/2007 | REFUELING OUTAGE | | |
Quad Cities 2 | 96 | | 100% ELECTRICAL CAPABILITY | | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Arkansas Nuclear 1 | 78 | | INCREASING POWER | * | |
Arkansas Nuclear 2 | 100 | | | | |
Callaway | 100 | | | | |
Columbia Generating Station | 0 | 05/12/2007 | REFUELING OUTAGE | * | |
Comanche Peak 1 | 100 | | | | |
Comanche Peak 2 | 100 | | | | |
Cooper | 100 | | | | |
Diablo Canyon 1 | 0 | 04/30/2007 | DEFUELED - ONLY 1 OFFSITE SOURCE - TRANSFORMER MAINT | | |
Diablo Canyon 2 | 100 | | | | |
Fort Calhoun | 100 | | | * | |
Grand Gulf 1 | 100 | | | | |
Palo Verde 1 | 100 | | | | |
Palo Verde 2 | 100 | | | * | |
Palo Verde 3 | 100 | | | | |
River Bend 1 | 100 | | | | |
San Onofre 2 | 99 | | 100% ELECTRICAL CAPABILITY | | |
San Onofre 3 | 77 | | INCREASING POWER AFTER MAINTENANCE WORK | * | |
South Texas 1 | 100 | | | | |
South Texas 2 | 100 | | | | |
Waterford 3 | 100 | | | | |
Wolf Creek 1 | 100 | | | | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
Page Last Reviewed/Updated Thursday, March 25, 2021