The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 10, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100   SWITCHYARD WORK    
Calvert Cliffs 2 100   SWITCHYARD WORK    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100   MAINTENANCE ON FEEDER 95331    
Indian Point 3 100   MAINTENANCE ON FEEDER 95331 & 95891 *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100   SWITCHYARD WORK    
Millstone 3 0 04/07/2007 REFUELING OUTAGE AND SWITCHYARD WORK    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 20   HOLDING FOR TURBINE OVERSPEED TEST *  
Salem 1 95   HOLDING FOR FUEL CONDITIONING *  
Salem 2 100        
Seabrook 1 100   SWITCHYARD BREAKER 169 OOS UNTIL 23MAY07    
Susquehanna 1 100     *  
Susquehanna 2 100     *  
Three Mile Island 1 100     *  
Vermont Yankee 96   COASTDOWN TO REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 MAINTENANCE OUTAGE 0800 ON 5/11/07 TAGOUT OF 500KV BUS 1 *  
Browns Ferry 2 100   0800 ON 5/11/07 TAGOUT OF 500KV BUS 1 *  
Browns Ferry 3 100   0800 ON 5/11/07 TAGOUT OF 500KV BUS 1 *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 0 04/09/2007 REFUELING OUTAGE HEATUP IN PROGRESS *  
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 03/10/2007 REFUELING OUTAGE. REPLACING FW LEVEL INSTRUMENT. INVESTIGATING STUCK CONTROL ROD (H8). *  
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 04/27/2007 DEFUELED    
Oconee 3 100        
Robinson 2 0 04/06/2007 REFUELING OUTAGE    
Saint Lucie 1 0 04/01/2007 REFUELING OUTAGE    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98   100% ELECTRICAL CAPABILITY.    
Vogtle 2 100     *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 85   INCREASING POWER *  
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 88   INCREASING POWER *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 0 05/08/2007 SEE EN #43351 - ANTICIPATE 5/13 STARTUP *  
Perry 1 0 04/01/2007 REFUELING OUTAGE    
Point Beach 1 100     *  
Point Beach 2 100        
Prairie Island 1 55   PLANNED S/D NOW ON 5/11/07 TO REPAIR FW PUMP *  
Prairie Island 2 100        
Quad Cities 1 0 05/04/2007 REFUELING OUTAGE    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 05/01/2007 REFUELING OUTAGE    
Arkansas Nuclear 2 100        
Callaway 10   EXPECTING TO SYNC 5/10/07 *  
Columbia Generating Station 89   COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 0 04/30/2007 DEFUELED, ONLY 1 OFFSITE SOURCE *  
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100   RED OFFSITE LINE OOS *  
Palo Verde 2 100   RED OFFSITE LINE OOS *  
Palo Verde 3 100   RED OFFSITE LINE OOS *  
River Bend 1 76   ROD PATTERN ADJUSTMENTS *  
San Onofre 2 99   100% ELECTRICAL CAPABILITY    
San Onofre 3 100        
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.