The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for May 4, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100   SWITCHYARD BREAKER #552-21 MAINTENANCE REDUCING POWER THIS MORNING FOR CIRC PP MAINT *  
Calvert Cliffs 2 100   SWITCHYARD BREAKER #552-21 MAINTENANCE    
FitzPatrick 100        
Ginna 100     *  
Hope Creek 1 100        
Indian Point 2 100   MAINTENANCE ON FEEDER 95331 & 95891 *  
Indian Point 3 80   HOLDING FOR FUEL CONDITIONING MAINTENANCE ON FEEDER 95331 & 95891 *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 04/07/2007 REFUELING OUTAGE    
Nine Mile Point 1 100        
Nine Mile Point 2 100   LINE 6 OOS FOR MAINTENANCE    
Oyster Creek 0 04/28/2007 STARTUP IN PROGRESS *  
Peach Bottom 2 100     *  
Peach Bottom 3 100     *  
Pilgrim 1 0 04/06/2007 REFUELING OUTAGE VESSEL HEAD ON *  
Salem 1 70   INCREASING POWER *  
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 97   COASTDOWN TO REFUELING OUTAGE    

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 MAINTENANCE OUTAGE 500KV BUS 2 SECTION 1 & 2 OUT OF SERVICE    
Browns Ferry 2 100   500KV BUS 2 SECTION 1 & 2 OUT OF SERVICE *  
Browns Ferry 3 100   500KV BUS 2 SECTION 1 & 2 OUT OF SERVICE    
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 0 04/09/2007 REFUELING OUTAGE    
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 03/10/2007 REFUELING OUTAGE    
McGuire 2 100        
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 0 04/27/2007 REFUELING OUTAGE    
Oconee 3 100        
Robinson 2 0 04/06/2007 REFUELING OUTAGE    
Saint Lucie 1 0 04/01/2007 REFUELING OUTAGE    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98   100% ELECTRICAL CAPABILITY.    
Vogtle 2 30   INCREASING POWER *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 53   INCREASING POWER *  
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 94   "A" HEATER DRAIN PUMP MAINTENANCE *  
La Salle 1 100        
La Salle 2 100        
Monticello 95   INCREASING POWER *  
Palisades 100        
Perry 1 0 04/01/2007 REFUELING OUTAGE    
Point Beach 1 0 03/31/2007 EXITING REFUELING OUTAGE *  
Point Beach 2 100        
Prairie Island 1 56   FEED WATER PUMP REPAIRS *  
Prairie Island 2 100     *  
Quad Cities 1 77   COASTDOWN TO REFUELING OUTAGE    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 05/01/2007 REFUELING OUTAGE    
Arkansas Nuclear 2 100        
Callaway 0 04/01/2007 EXITING REFUELING OUTAGE    
Columbia Generating Station 92   COASTDOWN TO REFUELING OUTAGE    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 0 04/30/2007 REFUELING OUTAGE    
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100     *  
River Bend 1 100        
San Onofre 2 99   100% ELECTRICAL CAPABILITY    
San Onofre 3 100        
South Texas 1 100     *  
South Texas 2 100     *  
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021