The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for April 22, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 0 04/06/2007 HEAT UP IN PROGRESS *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 04/07/2007 REFUELING OUTAGE DEFUELED    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 0 04/06/2007 REFUELING OUTAGE RV INSPECTIONS IN PROGRESS *  
Salem 1 80   INCREASING POWER AFTER COMPLETION OF 16-HR HOLD *  
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 75   REDUCTION IN POWER FOR ROD SEQUENCE EXCHANGE *  
Susquehanna 2 100     *  
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 MAINTENANCE OUTAGE    
Browns Ferry 2 74   INCREASING POWER POWER ASCENSION TESTING *  
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 99   ROD PATTERN IMPROVEMENT AT 0900 THEN INCREASING POWER TO 100% *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 0 04/09/2007 DEFUELED    
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 0 03/10/2007 REFUELING OUTAGE ANTICIPATE ENTERING MODE 5 ON DAYSHIFT *  
McGuire 2 100        
North Anna 1 100        
North Anna 2 5   HOLDING POWER FOR TURBINE VALVE TESTING *  
Oconee 1 100        
Oconee 2 91   COASTDOWN TO REFUELING OUTAGE    
Oconee 3 100        
Robinson 2 0 04/06/2007 DEFUELED    
Saint Lucie 1 0 04/01/2007 DEFUELED    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98   100% ELECTRICAL CAPABILITY.    
Vogtle 2 25   INCREASING POWER TO 30% FOR CHEMISTRY HOLD *  
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 0 04/01/2007 REFUELING OUTAGE    
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 98   100% ELECTRICAL CAPABILITY *  
Duane Arnold 99   100% ELECTRICAL CAPABILITY *  
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 0 03/13/2007 REFUELING OUTAGE    
Palisades 100     *  
Perry 1 0 04/01/2007 REFUELING OUTAGE    
Point Beach 1 0 03/31/2007 REFUELING OUTAGE *  
Point Beach 2 100        
Prairie Island 1 100   345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY    
Prairie Island 2 100   345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY.    
Quad Cities 1 82   COASTDOWN TO REFUELING OUTAGE    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 87   DOWNPOWER MANEUVER IN PROGRESS. UNIT SCHEDULED TO BE OFF-LINE AT 0800. *  
Arkansas Nuclear 2 100        
Callaway 0 04/01/2007 REFUELING OUTAGE    
Columbia Generating Station 97   COASTDOWN TO REFUELING OUTAGE *  
Comanche Peak 1 40   INCREASING POWER *  
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100     *  
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 0 04/12/2007 MAINTENANCE OUTAGE TO REPAIR TURBINE LUBE OIL PROBLEM    
River Bend 1 100        
San Onofre 2 99     *  
San Onofre 3 100        
South Texas 1 100        
South Texas 2 0 03/25/2007 REFUELING OUTAGE *  
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021