Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 0 | 04/06/2007 | SHUTDOWN DUE TO TRANSFORMER ISSUE; UNIT ON RHR COOLING | * | |
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | 345 KV LINE WILL BE TAKEN OOS (LINE #371) ON DAY SHIFT FOR SWITCHYARD MAINTENANCE INCLUDING SOUTH BUS OUTAGE; IN PLANT TS FOR OFFSITE SOURCES; HIGH RISK TEST FOR MULITPLE RX TRIP RISK | * | ||
Millstone 3 | 0 | 04/07/2007 | DEFUELED-345 KV LINE WILL BE TAKEN OOS (LINE #371) ON DAY SHIFT FOR SWITCHYARD MAINTENANCE INCLUDING SOUTH BUS OUTAGE | * | |
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 0 | 04/06/2007 | REFUELING OUTAGE | ||
Salem 1 | 19 | HOLDING POWER - GENERATOR OFFLINE DUE TO ISSUE WITH EXCITER | * | ||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | GENERATOR VOLTAGE REGULATOR IN MANUAL. | |||
Susquehanna 2 | 85 | HOLDING POWER FOR TESTING, ANTICIPATE INCREASE LATER TODAY - GENERATOR VOLTAGE REGULATOR IN MANUAL. | * | ||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | DURING DAY SHIFT WILL REMOVE A 500 KV BUS 1, SECTION 1&2, RED GEN RISK. | * | |
Browns Ferry 2 | 35 | HOLDING POWER FOR SCRAM TIME TESTING - DURING DAY SHIFT WILL REMOVE A 500 KV BUS 1, SECTION 1&2, RED GEN RISK. | * | ||
Browns Ferry 3 | 100 | DURING DAY SHIFT WILL REMOVE A 500 KV BUS 1, SECTION 1&2, RED GEN RISK. | * | ||
Brunswick 1 | 100 | ||||
Brunswick 2 | 75 | ANTICIPATE TO INCREASE POWER AT 0600 | * | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 0 | 04/09/2007 | DEFUELED | ||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 0 | 03/10/2007 | REFUELING OUTAGE - CORE RELOAD COMPLETED - PLAN TO SET RV HEAD TODAY | * | |
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 03/17/2007 | NORMAL OPERATING TEMP - PLAN TO ENTER MODE 2 ON DAYSHIFT | * | |
Oconee 1 | 100 | ||||
Oconee 2 | 96 | COASTDOWN TO REFUELING OUTAGE - WILL BE REDUCING POWER AT APPROX 1%/24 HRS UNTIL RFO IS ENTERED ON 4/28 | * | ||
Oconee 3 | 100 | ||||
Robinson 2 | 0 | 04/06/2007 | DEFUELED | ||
Saint Lucie 1 | 0 | 04/01/2007 | DEFUELED | ||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY. | |||
Vogtle 2 | 0 | 03/03/2007 | REFUELING OUTAGE - CURRENTLY PERFORMING HOT ROD TESTING, ANTICIPATE ENTERING MODE 2 AT 1100 | * | |
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | * | |||
Byron 2 | 0 | 04/01/2007 | REFUELING OUTAGE | * | |
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | * | ||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY; A 345 KV LINE IS OOS WHICH IS 1 OF 6 OFFSITE LINES | * | ||
Fermi 2 | 100 | ||||
Kewaunee | 100 | ||||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 0 | 03/13/2007 | REFUELING OUTAGE | ||
Palisades | 100 | SWITCHYARD BATTERY REPLACEMENT CONTINUES | * | ||
Perry 1 | 0 | 04/01/2007 | REFUELING OUTAGE | ||
Point Beach 1 | 0 | 03/31/2007 | RELOADING FUEL | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | |||
Prairie Island 2 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY. | |||
Quad Cities 1 | 82 | COASTDOWN TO REFUELING OUTAGE | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 93 | COASTDOWN TO REFUELING OUTAGE | |||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 0 | 04/01/2007 | REFUELING OUTAGE | * | |
Columbia Generating Station | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
Comanche Peak 1 | 0 | 02/24/2007 | CRITICAL - LOW POWER PHYSICS TESTING | * | |
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ONE 230 KV STARTUP LINE OOS WITH COMP MEASURES | * | ||
Diablo Canyon 2 | 100 | ONE 230 KV STARTUP LINE OOS WITH COMP MEASURES | * | ||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 65 | HOLDING POWER FOR MAINTENANCE | * | ||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 0 | 04/12/2007 | MAINTENANCE OUTAGE TO REPAIR TURBINE LUBE OIL PROBLEM - RCS COOLDOWN TO MODE 5 IN PROGRESS | ||
River Bend 1 | 100 | * | |||
San Onofre 2 | 99 | 100% ELECTRICAL CAPABILITY | |||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 03/25/2007 | CORE RELOAD COMPLETE | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |