Power Reactor Status Report for March 28, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 82 | REDUCED FOR WATER BOX CLEANING | |||
Beaver Valley 2 | 99 | ONE TGV ISOLATED FOR MAINTENANCE | |||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 0 | 02/25/2007 | REFUELING OUTAGE | ||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 0 | 03/06/2007 | REFUELING OUTAGE | ||
Limerick 1 | 100 | ||||
Limerick 2 | 0 | 03/09/2007 | REFUELING OUTAGE | * | |
Millstone 2 | 100 | RING BUS RELAY WORK IN SWITCHYARD 3/26 - 4/5 | |||
Millstone 3 | 100 | RING BUS RELAY WORK IN SWITCHYARD 3/26 - 4/5 | |||
Nine Mile Point 1 | 0 | 03/16/2007 | REFUELING OUTAGE AND 345KV BKR OOS FOR MAINTENANCE | ||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 90 | RECIRC PUMP SEAL MONITORING | |||
Peach Bottom 2 | 100 | NOTTINGHAM / GRACELAND LINE OOS | * | ||
Peach Bottom 3 | 100 | NOTTINGHAM / GRACELAND LINE OOS | * | ||
Pilgrim 1 | 83 | COASTDOWN TO REFUELING OUTAGE | * | ||
Salem 1 | 0 | 03/27/2007 | REFUELING OUTAGE | * | |
Salem 2 | 100 | ||||
Seabrook 1 | 96 | HIGH TEMPERATURE ON NEUTRAL BUS BUSHING | |||
Susquehanna 1 | 100 | MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL | |||
Susquehanna 2 | 0 | 03/03/2007 | REFUELING OUTAGE | ||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 | * |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | 500 KV (MADISON) LINES OOS | ||
Browns Ferry 2 | 0 | 02/20/2007 | REFUELING OUTAGE 500 KV (MADISON) LINES OOS | ||
Browns Ferry 3 | 100 | 500 KV (MADISON) LINES OOS | |||
Brunswick 1 | 100 | ||||
Brunswick 2 | 0 | 03/02/2007 | REFUELING OUTAGE | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | SWITCHYARD BREAKER WORK | |||
Farley 2 | 99 | COASTDOWN TO REFUELING OUTAGE SWITCHYARD BREAKER WORK | * | ||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 0 | 03/10/2007 | DEFUELED | ||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 0 | 03/17/2007 | DEFUELED | ||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | YELLOW GRID CONDITION | * | ||
Sequoyah 2 | 100 | YELLOW GRID CONDITION | * | ||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 97 | 100% ELECTRICAL CAPABILITY, OFFSITE SOURCE TEST IN PROGRESS | * | ||
Vogtle 2 | 0 | 03/03/2007 | DEFUELED | ||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 91 | COASTDOWN TO REFUELING OUTAGE | * | ||
Clinton | 97 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | TAKING 345 KV (BAYSHORE) LINE OUT | * | ||
Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 99 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | MAINTENANCE OFFSITE AFFECTING BROWNSTOWN 2 LINE UNTIL 3/29/07 | |||
Kewaunee | 99 | * | |||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 0 | 03/13/2007 | REFUELING OUTAGE | ||
Palisades | 96 | MAIN STEAM SYSTEM ISSUE | |||
Perry 1 | 95 | COASTDOWN TO REFUELING OUTAGE | * | ||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | |||
Prairie Island 2 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | |||
Quad Cities 1 | 91 | COASTDOWN TO REFUELING OUTAGE | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 85 | LOAD FOLLOWING | * | ||
Comanche Peak 1 | 0 | 02/24/2007 | DEFUELED | ||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | 345 KV (SAINT JOSEPH) LINE OOS | * | ||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 0 | 03/18/2007 | REFUELING OUTAGE | ||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | ||||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 0 | 03/25/2007 | REFUELING OUTAGE | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021