The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for March 13, 2007

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 0 02/25/2007 REFUELING OUTAGE    
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 0 03/06/2007 REFUELING OUTAGE    
Limerick 1 100        
Limerick 2 0 03/09/2007 REFUELING OUTAGE    
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 85   COASTDOWN TO REFUELING OUTAGE. SCHEDULED OUTAGE OF 345 KV LINE # 8    
Nine Mile Point 2 0 03/08/2007 'A' REACTOR RECIRC PUMP FAILURE - REPAIRS IN PROGRESS    
Oyster Creek 82   RECIRC PUMP SEAL REPAIR PENDING    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 86   COASTDOWN TO REFUELING OUTAGE *  
Salem 1 96   COASTDOWN TO REFUELING OUTAGE *  
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100   MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL    
Susquehanna 2 0 03/03/2007 REFUELING OUTAGE    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 500 KV (MADISON) LINE OOS 500 KV (UNION) LINE OOS    
Browns Ferry 2 0 02/20/2007 REFUELING OUTAGE 500 KV (MADISON) LINE OOS 500 KV (UNION) LINE OOS    
Browns Ferry 3 100   500 KV (MADISON) LINE OOS 500 KV (UNION) LINE OOS    
Brunswick 1 100        
Brunswick 2 0 03/02/2007 REFUELING OUTAGE - SAT IS OOS FOR MAINTENANCE    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 0 02/05/2007 REFUELING OUTAGE    
McGuire 1 0 03/10/2007 REFUELING OUTAGE    
McGuire 2 56   HOLDING POWER TO REPAIR MAIN FEED PUMP    
North Anna 1 100        
North Anna 2 98   COASTDOWN TO REFUELING OUTAGE *  
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98   100% ELECTRICAL CAPABILITY    
Vogtle 2 0 03/03/2007 REFUELING OUTAGE    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY *  
Duane Arnold 0 02/04/2007 REFUELING OUTAGE    
Fermi 2 100        
Kewaunee 100     *  
La Salle 1 100        
La Salle 2 0 02/25/2007 REFUELING OUTAGE *  
Monticello 97   COASTDOWN TO REFUELING OUTAGE    
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100   345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY    
Prairie Island 2 97   HOLDING POWER TO RESOLVE FEEDWATER HEATER LEVEL CONTROL ISSUE - 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY *  
Quad Cities 1 96   100% ELECTRICAL CAPABILITY - COASTDOWN TO REFUELING OUTAGE *  
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 4   WILL ENTER MODE 1 TODAY - ANTICIPATE TURBINE ROLL AT 1200 HRS *  
Columbia Generating Station 100        
Comanche Peak 1 0 02/24/2007 REFUELING OUTAGE - DEFUELED    
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 92   COASTDOWN TO REFUELING OUTAGE    
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 97   REDUCED POWER DUE TO CIRC WATER PUMP OOS *  
San Onofre 2 99        
San Onofre 3 100        
South Texas 1 100   PLANNED NORTH BUS OUTAGE AT 0700 HRS - ONLY 1 SOURCE OFFSITE POWER REMAINING *  
South Texas 2 85   COASTDOWN TO REFUELING OUTAGE - PLANNED NORTH BUS OUTAGE AT 0700 HRS - ONLY 1 SOURCE OFFSITE POWER REMAINING *  
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021