Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 0 | 02/25/2007 | REFUELING OUTAGE | ||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | * | |||
Indian Point 3 | 100 | OFFSITE 138kV FEEDER #95891 OOS FOR SCHEDULED MAINTENANCE | * | ||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | COASTDOWN TO REFUELING OUTAGE - INCREASED POWER BY REMOVING "5B" FEEDWATER HEATER | * | ||
Millstone 2 | 100 | PLANNED SWITCHYARD MAINTENANCE ON-GOING - NO IMPACT TO POWER OPERATIONS | * | ||
Millstone 3 | 100 | PLANNED SWITCHYARD MAINTENANCE ON-GOING - NO IMPACT TO POWER OPERATIONS | * | ||
Nine Mile Point 1 | 89 | COASTDOWN TO REFUELING OUTAGE | |||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | 3B RX FEEDPUMP RESTORED USING TEMP POWER | * | ||
Pilgrim 1 | 90 | COASTDOWN TO REFUELING OUTAGE | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL | * | ||
Susquehanna 2 | 100 | MAIN GENERATOR VOLTAGE REGULATOR IN MANUAL | * | ||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | 500 KV (MADISON) LINE OOS 500 KV (UNION) LINE OOS | ||
Browns Ferry 2 | 0 | 02/20/2007 | REFUELING OUTAGE 500 KV (MADISON) LINE OOS 500 KV (UNION) LINE OOS | ||
Browns Ferry 3 | 100 | 500 KV (MADISON) LINE OOS 500 KV (UNION) LINE OOS | |||
Brunswick 1 | 100 | ||||
Brunswick 2 | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | * | |||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | TORNADO WATCH IN EFFECT - 92 OF 100 COUNTIES HAVE ISSUED THUNDERSTORM WARNINGS - MINOR GRID DISTURBANCE OBSERVED | * | ||
Hatch 1 | 100 | ||||
Hatch 2 | 0 | 02/05/2007 | REFUELING OUTAGE | ||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 98 | HOLDING POWER FOR CAL | * | ||
Oconee 1 | 100 | ||||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | TORNADO WATCH ISSUED UNTIL 0800 HRS LOCAL TIME | * | ||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 49 | HOLDING POWER FOR WATERBOX CLEANING AND NORMAL CONTAINMENT COOLER REPAIRS | * | ||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | 345 KV LINE TO BE TAKEN OOS ON 3/2/07 | * | ||
Braidwood 2 | 100 | 345 KV LINE TO BE TAKEN OOS ON 3/2/07 | * | ||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 0 | 02/04/2007 | REFUELING OUTAGE | * | |
Fermi 2 | 100 | ||||
Kewaunee | 0 | 02/27/2007 | REACTOR TRIP. SEE EN #43196. | ||
La Salle 1 | 100 | ||||
La Salle 2 | 0 | 02/25/2007 | REFUELING OUTAGE | * | |
Monticello | 100 | ||||
Palisades | 0 | 02/26/2007 | MAINTENANCE OUTAGE | ||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | |||
Prairie Island 2 | 0 | 02/28/2007 | MAINTENANCE OUTAGE - 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | * | |
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 71 | INCREASING POWER | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | * | |||
Arkansas Nuclear 2 | 100 | * | |||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 0 | 02/24/2007 | REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS | ||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | * | |||
Diablo Canyon 2 | 100 | * | |||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 96 | COASTDOWN TO REFUELING OUTAGE | |||
Palo Verde 1 | 99 | REDUCED FOR S/G BLOWDOWN | * | ||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 99 | REDUCED FOR TURBINE VALVE TESTING | * | ||
River Bend 1 | 94 | REDUCED DUE TO CIRC WATER PUMP OOS | * | ||
San Onofre 2 | 99 | * | |||
San Onofre 3 | 98 | REDUCED DUE TO FEEDWATER HEATER MAINTENANCE | * | ||
South Texas 1 | 100 | ||||
South Texas 2 | 91 | COASTDOWN TO REFUELING OUTAGE | * | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |