Power Reactor Status Report for February 25, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 84 | WATER BOX CLEANING | |||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 89 | COASTDOWN TO REFUELING OUTAGE | * | ||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ||||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | COASTDOWN TO REFUELING OUTAGE | |||
Millstone 2 | 100 | 0600 EST ON 02/24/07 SCHEDULED 383 LINE - 345KV OUTAGE. | |||
Millstone 3 | 100 | 0600 EST ON 02/24/07 SCHEDULED 383 LINE - 345KV OUTAGE. | |||
Nine Mile Point 1 | 90 | COASTDOWN TO REFUELING OUTAGE | * | ||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 91 | COASTDOWN TO REFUELING OUTAGE | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 75 | ROD SEQUENCE EXCHANGE | * | ||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | CORE LOADED CAVITY FLOODED 500 KV (MADISON) LINE OOS | ||
Browns Ferry 2 | 0 | 02/20/2007 | REFUELING OUTAGE 500 KV (MADISON) LINE OOS | ||
Browns Ferry 3 | 100 | 500 KV (MADISON) LINE OOS | |||
Brunswick 1 | 100 | ||||
Brunswick 2 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 75 | HOLDING POWER FOR PLANNED MAINTENANCE | * | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 0 | 02/05/2007 | REFUELING OUTAGE | ||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 100 | * | |||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 90 | TURBINE VALVE TESTING IN PROGRESS. 345 KV LINES 8014 & 0302 TRIPPED. INVESTIGATION ONGOING. | * | ||
Dresden 3 | 85 | HOLDING POWER FOR WELD REPAIR OF RFP "A" . 345 KV LINES 8014 & 0302 TRIPPED. INVESTIGATION ONGOING. | * | ||
Duane Arnold | 0 | 02/04/2007 | REFUELING OUTAGE. 4 OF 6 POWER LINES DOWN DUE TO ICING. HAVE 2 161 KV LINES FEEDING THE EAST BUS AND THE WEST BUS. | * | |
Fermi 2 | 100 | EDG # 11 IS OSS FOR PLANNED MAINTENANCE. STILL HAVE EDGs #12, # 13, & # 14 FULLY OPERABLE IF NEEDED. ONLY NEED TWO TO SUPPORT VITAL BUSSES. | * | ||
Kewaunee | 100 | FEED FLOW MEASURING INSTRUMENT CALIBRATION ISSUE | |||
La Salle 1 | 100 | ||||
La Salle 2 | 87 | COASTDOWN TO REFUELING OUTAGE. | * | ||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | * | |||
Point Beach 1 | 95 | INCREASING POWER AFTER COMPLETING PLANNED TESTING | * | ||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | |||
Prairie Island 2 | 100 | 345 KV OFFSITE PWR LINE OOS UNTIL 1ST WEEK IN MAY | |||
Quad Cities 1 | 85 | REDUCED POWER FOR SCRAM TIME TESTING AND ROD SHUFFLE | * | ||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 0 | 02/24/2007 | REFUELING OUTAGE | * | |
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 98 | COASTDOWN TO REFUELING OUTAGE | |||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 0 | 02/19/2007 | SEE EN #43173 | ||
Palo Verde 3 | 99 | * | |||
River Bend 1 | 100 | ||||
San Onofre 2 | 100 | * | |||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |