Power Reactor Status Report for February 19, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 95 | POWER UP RATE | |||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 94 | COASTDOWN TO REFUELING OUTAGE | * | ||
FitzPatrick | 55 | DOWNPOWER TO PERFORM REPAIRS ON FEEDWATER PUMP SEAL | |||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | * | |||
Limerick 1 | 100 | * | |||
Limerick 2 | 100 | COASTDOWN TO REFUELING OUTAGE | |||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 92 | COASTDOWN TO REFUELING OUTAGE | |||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | ||||
Peach Bottom 3 | 100 | ||||
Pilgrim 1 | 93 | COASTDOWN TO REFUELING OUTAGE | |||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | GENERATOR VOLTAGE REGULATOR IN MANUAL | |||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 100 | ||||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | CORE LOADED CAVITY FLOODED 500 KV (MADISON) LINE OOS | ||
Browns Ferry 2 | 73 | COASTDOWN TO REFUELING OUTAGE 500 KV (MADISON) LINE OOS | |||
Browns Ferry 3 | 100 | 500 KV (MADISON) LINE OOS | * | ||
Brunswick 1 | 100 | ||||
Brunswick 2 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
Catawba 1 | 100 | ||||
Catawba 2 | 100 | ||||
Crystal River 3 | 52 | MAIN FEEDWATER PUMP TRIP | * | ||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ||||
Hatch 1 | 100 | ||||
Hatch 2 | 0 | 02/05/2007 | REFUELING OUTAGE | ||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 0 | 02/15/2007 | AUTOMATIC REACTOR TRIP. SEE EVENT # 43169 | ||
Oconee 2 | 18 | INCREASING POWER | * | ||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | ||||
Saint Lucie 2 | 100 | ||||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 100 | ||||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 100 | ||||
Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 100 |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 96 | 100% ELECTRICAL CAPABILITY | |||
D.C. Cook 1 | 100 | ||||
D.C. Cook 2 | 100 | ||||
Davis-Besse | 100 | ||||
Dresden 2 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
Duane Arnold | 0 | 02/04/2007 | REFUELING OUTAGE | ||
Fermi 2 | 100 | ||||
Kewaunee | 100 | FEED FLOW MEASURING INSTRUMENT CALIBRATION ISSUE | |||
La Salle 1 | 100 | * | |||
La Salle 2 | 89 | COASTDOWN TO REFUELING OUTAGE. | |||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | * | |||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 100 | ||||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 95 | 100% ELECTRICAL CAPABILITY | * |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | ||||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 99 | COASTDOWN TO REFUELING OUTAGE | * | ||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 100 | ||||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 100 | ||||
San Onofre 2 | 99 | STEAM GENERATOR TUBE PLUGGING LIMITATION | |||
San Onofre 3 | 100 | ||||
South Texas 1 | 100 | ||||
South Texas 2 | 98 | COASTDOWN TO REFUELING OUTAGE | * | ||
Waterford 3 | 100 | ||||
Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Thursday, March 25, 2021
Page Last Reviewed/Updated Thursday, March 25, 2021