Power Reactor Status Report for February 2, 2007
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Beaver Valley 1 | 100 | ||||
| Beaver Valley 2 | 100 | ||||
| Calvert Cliffs 1 | 100 | * | |||
| Calvert Cliffs 2 | 100 | ||||
| FitzPatrick | 100 | ||||
| Ginna | 100 | * | |||
| Hope Creek 1 | 80 | INCREASING POWER | * | ||
| Indian Point 2 | 100 | ||||
| Indian Point 3 | 100 | ||||
| Limerick 1 | 100 | ||||
| Limerick 2 | 100 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Millstone 2 | 100 | ||||
| Millstone 3 | 100 | ||||
| Nine Mile Point 1 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
| Nine Mile Point 2 | 100 | ||||
| Oyster Creek | 100 | ||||
| Peach Bottom 2 | 100 | ||||
| Peach Bottom 3 | 100 | ||||
| Pilgrim 1 | 100 | ||||
| Salem 1 | 100 | ||||
| Salem 2 | 100 | ||||
| Seabrook 1 | 100 | ||||
| Susquehanna 1 | 100 | GENERATOR VOLTAGE REGULATOR IN MANUAL | |||
| Susquehanna 2 | 100 | ||||
| Three Mile Island 1 | 100 | ||||
| Vermont Yankee | 100 |
Region 2
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Browns Ferry 1 | 0 | 03/03/1985 | CORE LOADED CAVITY FLOODED 500 KV (TRINITY AND MADISON) LINES OUT OF SERVICE | * | |
| Browns Ferry 2 | 93 | COASTDOWN TO REFUELING OUTAGE 500 KV (TRINITY AND MADISON) LINES OUT OF SERVICE | * | ||
| Browns Ferry 3 | 100 | 500 KV (TRINITY AND MADISON) LINES OUT OF SERVICE | * | ||
| Brunswick 1 | 100 | ||||
| Brunswick 2 | 99 | COASTDOWN TO REFUELING OUTAGE | |||
| Catawba 1 | 100 | ||||
| Catawba 2 | 100 | ||||
| Crystal River 3 | 100 | COASTAL FLOOD WARNING AND TORNADO WATCH | * | ||
| Farley 1 | 100 | ||||
| Farley 2 | 100 | ||||
| Harris 1 | 100 | ||||
| Hatch 1 | 0 | 01/30/2007 | REPAIR CONDENSER TUBE LEAK | ||
| Hatch 2 | 97 | COASTDOWN TO REFUELING OUTAGE | |||
| McGuire 1 | 100 | ||||
| McGuire 2 | 100 | ||||
| North Anna 1 | 100 | ||||
| North Anna 2 | 100 | ||||
| Oconee 1 | 100 | * | |||
| Oconee 2 | 100 | * | |||
| Oconee 3 | 100 | * | |||
| Robinson 2 | 100 | ||||
| Saint Lucie 1 | 100 | ||||
| Saint Lucie 2 | 100 | ||||
| Sequoyah 1 | 100 | ||||
| Sequoyah 2 | 100 | ||||
| Summer | 100 | ||||
| Surry 1 | 100 | ||||
| Surry 2 | 100 | ||||
| Turkey Point 3 | 100 | ||||
| Turkey Point 4 | 100 | ||||
| Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
| Vogtle 2 | 100 | ||||
| Watts Bar 1 | 100 |
Region 3
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Braidwood 1 | 100 | ||||
| Braidwood 2 | 100 | ||||
| Byron 1 | 100 | ||||
| Byron 2 | 100 | ||||
| Clinton | 96 | 100% ELECTRICAL CAPABILITY OFFSITE POWER SOURCE MAINTENANCE (LATHAM LINE ) ON 02/03 | * | ||
| D.C. Cook 1 | 100 | ||||
| D.C. Cook 2 | 100 | ||||
| Davis-Besse | 100 | ||||
| Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | * | ||
| Duane Arnold | 93 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Fermi 2 | 100 | ||||
| Kewaunee | 95 | HEATER DRAIN PUMP MAINTENANCE LIMITED TO 99% FOR FEED FLOW MEASURING INSTRUMENT CALIBRATION | |||
| La Salle 1 | 100 | ||||
| La Salle 2 | 93 | COASTDOWN TO REFUELING OUTAGE | * | ||
| Monticello | 100 | ||||
| Palisades | 100 | ||||
| Perry 1 | 99 | ROD PATTERN ADJUSTMENT SCHEDULED FOR SATURDAY | |||
| Point Beach 1 | 100 | ||||
| Point Beach 2 | 100 | ||||
| Prairie Island 1 | 100 | ||||
| Prairie Island 2 | 100 | ||||
| Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
| Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
| Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
|---|---|---|---|---|---|
| Arkansas Nuclear 1 | 100 | ||||
| Arkansas Nuclear 2 | 16 | INCREASING POWER | * | ||
| Callaway | 100 | ||||
| Columbia Generating Station | 100 | ||||
| Comanche Peak 1 | 100 | ||||
| Comanche Peak 2 | 100 | ||||
| Cooper | 100 | ||||
| Diablo Canyon 1 | 100 | ||||
| Diablo Canyon 2 | 100 | ||||
| Fort Calhoun | 100 | ||||
| Grand Gulf 1 | 100 | ||||
| Palo Verde 1 | 99 | * | |||
| Palo Verde 2 | 100 | ||||
| Palo Verde 3 | 91 | INCREASING POWER | * | ||
| River Bend 1 | 100 | ||||
| San Onofre 2 | 99 | STEAM GENERATOR TUBE PLUGGING LIMITATION | |||
| San Onofre 3 | 100 | ||||
| South Texas 1 | 100 | ||||
| South Texas 2 | 100 | ||||
| Waterford 3 | 100 | ||||
| Wolf Creek 1 | 100 |
Page Last Reviewed/Updated Wednesday, March 24, 2021
Page Last Reviewed/Updated Wednesday, March 24, 2021