The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for December 17, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100     *  
Calvert Cliffs 2 25   REDUCED POWER FOR VOLTAGE REGULATOR WORK - CURRENTLY INCREASING POWER TO 100% *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100     *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 94   REDUCED LOAD FOR SCHEDULED TESTING *  
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100   OFFSITE POWER LINE "220-34" IS INOP BUT AVAILABLE *  
Peach Bottom 3 100   OFFSITE POWER LINE "220-34" IS INOP BUT AVAILABLE *  
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100   GENERATOR VOLTAGE REGULATOR IN MANUAL    
Susquehanna 2 100     *  
Three Mile Island 1 100     *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 REFUELING OUTAGE - CORE RELOAD IN PROGRESS - ANTICIPATE COMPLETION ON 12/25 *  
Browns Ferry 2 100   1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE 1 OF 2 161 KV LINES OOS FOR PLANNED MAINTENANCE    
Browns Ferry 3 100   1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE 1 OF 2 161 KV LINES OOS FOR PLANNED MAINTENANCE    
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 0 11/10/2006 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
Catawba 2 100   CURRENTLY SUPPLYING AUX STEAM TO UNIT 1    
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 100     *  
North Anna 2 100     *  
Oconee 1 20   HOLDING POWER - TURBINE GENERATOR TESTING *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 0 11/26/2006 REFUELING OUTAGE - RV HEAD SET BUT NOT TENSIONED *  
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 98        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 96   FW PUMP SWAP *  
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 97   100% ELECTRICAL CAPABILITY    
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 99        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 0 12/13/2006 FORCED OUTAGE - INSTRUMENT AIR REPAIRS COMPLETED *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100     *  
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100   1 X 500 KV LINE (BREAKER 632) WILL BE TAKEN OOS FOR PLANNED MAINTENANCE    
Diablo Canyon 2 54   UNIT WILL RETURN TO FULL POWER ONCE CIRC WATER PUMP REPAIRS ARE COMPLETED NEXT WEEK    
Fort Calhoun 98   REDUCED POWER IN PREPARATION FOR MTC TESTING ON 12/17    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 99   S/G BLOWDOWN *  
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 34   INCREASING POWER *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 0 11/25/2006 REFUELING OUTAGE    
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.