Power Reactor Status Report for December 17, 2006
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Beaver Valley 1 | 100 | | | | |
Beaver Valley 2 | 100 | | | | |
Calvert Cliffs 1 | 100 | | | * | |
Calvert Cliffs 2 | 25 | | REDUCED POWER FOR VOLTAGE REGULATOR WORK - CURRENTLY INCREASING POWER TO 100% | * | |
FitzPatrick | 100 | | | | |
Ginna | 100 | | | | |
Hope Creek 1 | 100 | | | * | |
Indian Point 2 | 100 | | | | |
Indian Point 3 | 100 | | | | |
Limerick 1 | 94 | | REDUCED LOAD FOR SCHEDULED TESTING | * | |
Limerick 2 | 100 | | | | |
Millstone 2 | 100 | | | | |
Millstone 3 | 100 | | | | |
Nine Mile Point 1 | 100 | | | | |
Nine Mile Point 2 | 100 | | | | |
Oyster Creek | 100 | | | | |
Peach Bottom 2 | 100 | | OFFSITE POWER LINE "220-34" IS INOP BUT AVAILABLE | * | |
Peach Bottom 3 | 100 | | OFFSITE POWER LINE "220-34" IS INOP BUT AVAILABLE | * | |
Pilgrim 1 | 100 | | | | |
Salem 1 | 100 | | | | |
Salem 2 | 100 | | | | |
Seabrook 1 | 100 | | | | |
Susquehanna 1 | 100 | | GENERATOR VOLTAGE REGULATOR IN MANUAL | | |
Susquehanna 2 | 100 | | | * | |
Three Mile Island 1 | 100 | | | * | |
Vermont Yankee | 100 | | | | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Browns Ferry 1 | 0 | 03/03/1985 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS - ANTICIPATE COMPLETION ON 12/25 | * | |
Browns Ferry 2 | 100 | | 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE 1 OF 2 161 KV LINES OOS FOR PLANNED MAINTENANCE | | |
Browns Ferry 3 | 100 | | 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE 1 OF 2 161 KV LINES OOS FOR PLANNED MAINTENANCE | | |
Brunswick 1 | 100 | | | | |
Brunswick 2 | 100 | | | | |
Catawba 1 | 0 | 11/10/2006 | REFUELING OUTAGE - CORE RELOAD IN PROGRESS | * | |
Catawba 2 | 100 | | CURRENTLY SUPPLYING AUX STEAM TO UNIT 1 | | |
Crystal River 3 | 100 | | | | |
Farley 1 | 100 | | | | |
Farley 2 | 100 | | | | |
Harris 1 | 100 | | | | |
Hatch 1 | 100 | | | | |
Hatch 2 | 100 | | | | |
McGuire 1 | 100 | | | | |
McGuire 2 | 100 | | | | |
North Anna 1 | 100 | | | * | |
North Anna 2 | 100 | | | * | |
Oconee 1 | 20 | | HOLDING POWER - TURBINE GENERATOR TESTING | * | |
Oconee 2 | 100 | | | | |
Oconee 3 | 100 | | | | |
Robinson 2 | 100 | | | | |
Saint Lucie 1 | 100 | | | | |
Saint Lucie 2 | 100 | | | | |
Sequoyah 1 | 100 | | | | |
Sequoyah 2 | 0 | 11/26/2006 | REFUELING OUTAGE - RV HEAD SET BUT NOT TENSIONED | * | |
Summer | 100 | | | | |
Surry 1 | 100 | | | | |
Surry 2 | 100 | | | | |
Turkey Point 3 | 100 | | | | |
Turkey Point 4 | 100 | | | | |
Vogtle 1 | 98 | | | | |
Vogtle 2 | 100 | | | | |
Watts Bar 1 | 100 | | | | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Braidwood 1 | 96 | | FW PUMP SWAP | * | |
Braidwood 2 | 100 | | | | |
Byron 1 | 100 | | | | |
Byron 2 | 100 | | | | |
Clinton | 96 | | 100% ELECTRICAL CAPABILITY | | |
D.C. Cook 1 | 100 | | | | |
D.C. Cook 2 | 100 | | | | |
Davis-Besse | 100 | | | | |
Dresden 2 | 97 | | 100% ELECTRICAL CAPABILITY | | |
Dresden 3 | 98 | | 100% ELECTRICAL CAPABILITY | | |
Duane Arnold | 98 | | 100% ELECTRICAL CAPABILITY | | |
Fermi 2 | 100 | | | | |
Kewaunee | 99 | | | | |
La Salle 1 | 100 | | | | |
La Salle 2 | 100 | | | | |
Monticello | 100 | | | | |
Palisades | 100 | | | | |
Perry 1 | 0 | 12/13/2006 | FORCED OUTAGE - INSTRUMENT AIR REPAIRS COMPLETED | * | |
Point Beach 1 | 100 | | | | |
Point Beach 2 | 100 | | | | |
Prairie Island 1 | 100 | | | | |
Prairie Island 2 | 100 | | | * | |
Quad Cities 1 | 97 | | 100% ELECTRICAL CAPABILITY | | |
Quad Cities 2 | 96 | | 100% ELECTRICAL CAPABILITY | | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Arkansas Nuclear 1 | 100 | | | | |
Arkansas Nuclear 2 | 100 | | | | |
Callaway | 100 | | | | |
Columbia Generating Station | 100 | | | | |
Comanche Peak 1 | 100 | | | | |
Comanche Peak 2 | 100 | | | | |
Cooper | 100 | | | | |
Diablo Canyon 1 | 100 | | 1 X 500 KV LINE (BREAKER 632) WILL BE TAKEN OOS FOR PLANNED MAINTENANCE | | |
Diablo Canyon 2 | 54 | | UNIT WILL RETURN TO FULL POWER ONCE CIRC WATER PUMP REPAIRS ARE COMPLETED NEXT WEEK | | |
Fort Calhoun | 98 | | REDUCED POWER IN PREPARATION FOR MTC TESTING ON 12/17 | | |
Grand Gulf 1 | 100 | | | | |
Palo Verde 1 | 100 | | | | |
Palo Verde 2 | 100 | | | | |
Palo Verde 3 | 99 | | S/G BLOWDOWN | * | |
River Bend 1 | 100 | | | | |
San Onofre 2 | 99 | | STEAM GENERATOR TUBE PLUGGING LIMITATION | | |
San Onofre 3 | 34 | | INCREASING POWER | * | |
South Texas 1 | 100 | | | | |
South Texas 2 | 100 | | | | |
Waterford 3 | 0 | 11/25/2006 | REFUELING OUTAGE | | |
Wolf Creek 1 | 100 | | | | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
Page Last Reviewed/Updated Thursday, March 25, 2021