Power Reactor Status Report for December 6, 2006
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Beaver Valley 1 | 100 | ||||
Beaver Valley 2 | 100 | ||||
Calvert Cliffs 1 | 100 | ||||
Calvert Cliffs 2 | 100 | ||||
FitzPatrick | 100 | ||||
Ginna | 100 | ||||
Hope Creek 1 | 100 | ||||
Indian Point 2 | 100 | ||||
Indian Point 3 | 100 | ONE OF FOUR OFFSITE POWER SOURCES DOWN FOR MAINTENANCE | |||
Limerick 1 | 100 | ||||
Limerick 2 | 100 | ||||
Millstone 2 | 100 | ||||
Millstone 3 | 100 | ||||
Nine Mile Point 1 | 100 | ||||
Nine Mile Point 2 | 100 | ||||
Oyster Creek | 100 | ||||
Peach Bottom 2 | 100 | OUTAGE ON 1 OF 2 SAFETY BUSES BEGINNING 12/3 ENDING 12/6 | |||
Peach Bottom 3 | 100 | OUTAGE ON 1 OF 2 SAFETY BUSES BEGINNING 12/3 ENDING 12/6 | |||
Pilgrim 1 | 100 | ||||
Salem 1 | 100 | ||||
Salem 2 | 100 | ||||
Seabrook 1 | 100 | ||||
Susquehanna 1 | 100 | GENERATOR VOLTAGE REGULATOR IN MANUAL | * | ||
Susquehanna 2 | 100 | ||||
Three Mile Island 1 | 100 | 1 OF 4 OFFSITE LINES (LINE 1092) OOS UNTIL 12/8 | * | ||
Vermont Yankee | 100 |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Browns Ferry 1 | 0 | 03/03/1985 | DEFUELED | ||
Browns Ferry 2 | 100 | 1 OF 2 161 KV LINES OOS AND 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE | |||
Browns Ferry 3 | 100 | 1 OF 2 161 KV LINES OOS AND 1 OF 7 500 KV LINES OOS FOR PLANNED MAINTENANCE | |||
Brunswick 1 | 100 | ||||
Brunswick 2 | 100 | ||||
Catawba 1 | 0 | 11/10/2006 | DEFUELED | ||
Catawba 2 | 100 | ||||
Crystal River 3 | 100 | ||||
Farley 1 | 100 | ||||
Farley 2 | 100 | ||||
Harris 1 | 100 | ONE DIESEL OOS FOR MAINTENANCE | * | ||
Hatch 1 | 100 | ||||
Hatch 2 | 100 | ||||
McGuire 1 | 100 | ||||
McGuire 2 | 100 | ||||
North Anna 1 | 100 | ||||
North Anna 2 | 100 | ||||
Oconee 1 | 0 | 10/06/2006 | REFUELING OUTAGE | ||
Oconee 2 | 100 | ||||
Oconee 3 | 100 | ||||
Robinson 2 | 100 | ||||
Saint Lucie 1 | 100 | "A" TRAIN OFFSITE POWER (1 OF 2 TRAINS) OOS FOR PLANNED MAINTENANCE | * | ||
Saint Lucie 2 | 100 | "A" TRAIN OFFSITE POWER (1 OF 2 TRAINS) OOS FOR PLANNED MAINTENANCE | * | ||
Sequoyah 1 | 100 | ||||
Sequoyah 2 | 0 | 11/26/2006 | DEFUELED | ||
Summer | 100 | ||||
Surry 1 | 100 | ||||
Surry 2 | 100 | ||||
Turkey Point 3 | 100 | ||||
Turkey Point 4 | 0 | 10/30/2006 | LOW POWER PHYSICS TESTING | * | |
Vogtle 1 | 98 | 100% ELECTRICAL CAPABILITY | |||
Vogtle 2 | 100 | ||||
Watts Bar 1 | 75 | HOLDING POWER FOR TESTING |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Braidwood 1 | 100 | ||||
Braidwood 2 | 100 | ||||
Byron 1 | 100 | ||||
Byron 2 | 100 | ||||
Clinton | 47 | HOLDING POWER FOR GRID MAINTENANCE - 1 OF 3 345 KV LINES HAS A PROBLEM | * | ||
D.C. Cook 1 | 100 | * | |||
D.C. Cook 2 | 100 | * | |||
Davis-Besse | 100 | ||||
Dresden 2 | 97 | 100% ELECTRICAL CAPABILITY | |||
Dresden 3 | 98 | 100% ELECTRICAL CAPABILITY | |||
Duane Arnold | 98 | 100% ELECTRICAL CAPABILITY | |||
Fermi 2 | 100 | ||||
Kewaunee | 99 | 100% ELECTRICAL CAPABILITY | |||
La Salle 1 | 100 | ||||
La Salle 2 | 100 | ||||
Monticello | 100 | ||||
Palisades | 100 | ||||
Perry 1 | 100 | ||||
Point Beach 1 | 100 | ||||
Point Beach 2 | 100 | ||||
Prairie Island 1 | 100 | ||||
Prairie Island 2 | 0 | 11/14/2006 | REFUELING OUTAGE | ||
Quad Cities 1 | 97 | 100% ELECTRICAL CAPABILITY | |||
Quad Cities 2 | 96 | 100% ELECTRICAL CAPABILITY |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
---|---|---|---|---|---|
Arkansas Nuclear 1 | 100 | ||||
Arkansas Nuclear 2 | 100 | ||||
Callaway | 100 | SWITCHYARD MAINTENANCE UNTIL 12/8 | |||
Columbia Generating Station | 100 | ||||
Comanche Peak 1 | 100 | ||||
Comanche Peak 2 | 100 | ||||
Cooper | 100 | ||||
Diablo Canyon 1 | 100 | ||||
Diablo Canyon 2 | 100 | ||||
Fort Calhoun | 37 | INCREASING POWER TO 50% AS REQUIRED FOR FUEL CONDITIONING AND TESTING OF NEW NSSS RP SYSTEM | * | ||
Grand Gulf 1 | 100 | ||||
Palo Verde 1 | 100 | ||||
Palo Verde 2 | 100 | ||||
Palo Verde 3 | 100 | ||||
River Bend 1 | 75 | REDUCED POWER FOR CONDENSER WATERBOX REPAIRS - TUBE PLUGGING | * | ||
San Onofre 2 | 99 | STEAM GENERATOR TUBE PLUGGING LIMITATION | * | ||
San Onofre 3 | 0 | 10/16/2006 | REFUELING OUTAGE | ||
South Texas 1 | 100 | ||||
South Texas 2 | 100 | ||||
Waterford 3 | 0 | 11/25/2006 | REFUELING OUTAGE | ||
Wolf Creek 1 | 100 | "A" EDG OUTAGE | * |