The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 14, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 66   INCREASING POWER *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100     *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 10/06/2006 STARTUP PREPARATIONS IN PROGRESS    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 95   INCREASING POWER *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100     *  
Susquehanna 1 100     *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 71   DOWNPOWER MANUEVER TO 60% TO PERFORM PLANNED 345 KV LINE OUTAGE ON LINE #381 *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100   2 (500 KV) OF 7 OFFSITE LINES OOS.    
Browns Ferry 3 100   2 (500 KV) OF 7 OFFSITE LINES OOS.    
Brunswick 1 100        
Brunswick 2 0 11/01/2006 SCRAM - SEE EN #42986    
Catawba 1 0 11/10/2006 REFUELING OUTAGE    
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 95   HOLDING *  
North Anna 1 0 11/12/2006 PLANNED MID-CYCLE OUTAGE FOR PZR MANWAY REPAIR    
North Anna 2 100        
Oconee 1 0 10/06/2006 DEFUELED    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 93   COASTDOWN TO REFUELING OUTAGE *  
Summer 0 10/13/2006 REFUELING OUTAGE    
Surry 1 100        
Surry 2 0 10/07/2006 STARTUP PREPARATIONS IN PROGRESS    
Turkey Point 3 100        
Turkey Point 4 0 10/30/2006 DEFUELED    
Vogtle 1 98   TURBINE VALVE LIMITED    
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 95   FEEDPUMP SWAP *  
Byron 1 100   U1 TRANSFORMER OUTAGE; SAFETY BUSES CROSS TIED TO U2    
Byron 2 100   SUPPORTING U1 TRANSFORMER OUTAGE WITH SAFETY BUS CROSS TIE TO U1    
Clinton 96   100% ELECTRICAL CAPABILITY *  
D.C. Cook 1 25   PERFORMING DIGITAL TURBINE CONTROL TESTING *  
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 85   83% ELECTRICAL CAPABILITY - HOLDING POWER DUE TO DAMAGED FEEDWATER HEATER    
Dresden 3 0 11/03/2006 REFUELING OUTAGE    
Duane Arnold 98   100% ELECTRICAL CAPABILITY *  
Fermi 2 100        
Kewaunee 0 11/10/2006 TRIP - SEE EN #42983    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 0 10/15/2006 HEATING UP    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 10/20/2006 REFUELING OUTAGE *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/09/2006 REFUELING OUTAGE *  
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 8   INCREASING POWER *  
Palo Verde 3 100        
River Bend 1 74   PLANNED WATER BOX AND FEED PUMP MAINTENANCE    
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 DEFUELED    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021