Power Reactor Status Report for November 11, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 10/01/2006 RCS HEATUP IN PROGRESS *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100   SOLAR ACTIVITY K=5 LEVEL *  
Ginna 91   HOLDING FOR FW REG VALVE TUNING    
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100   ALTERNATE ELECTRICAL CONFIG WITH PLANNED OUTAGE OF #20 BUS    
Limerick 2 100   ALTERNATE ELECTRICAL CONFIG WITH PLANNED OUTAGE OF #20 BUS    
Millstone 2 0 10/06/2006 STARTUP PREPARATIONS IN PROGRESS    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 10/15/2006 STARTUP IN PROGRESS - REACTOR IS SUBCRITICAL *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 48   HOLDING POWER FOR REACTOR ENGINEERING DATA ACQUISITION *  
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100   2 (500 KV) OF 7 OFFSITE LINES OOS.    
Browns Ferry 3 100   2 (500 KV) OF 7 OFFSITE LINES OOS.    
Brunswick 1 100        
Brunswick 2 0 11/01/2006 REACTOR IS SUBCRITICAL *  
Catawba 1 0 11/10/2006 REFUELING OUTAGE *  
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 15   HOLDING POWER FOR TURBINE SOAK - GENERATOR IS ONLINE *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 DEFUELED    
Oconee 2 100   ON MONDAY WILL EVALUATE WHETHER TO CHANGE GRID STATUS FROM YELLOW TO ORANGE BASED ON HAVING 3 NUCLEAR UNITS DOWN (CATAWBA, McGUIRE AND OCONEE) *  
Oconee 3 100   ON MONDAY WILL EVALUATE WHETHER TO CHANGE GRID STATUS FROM YELLOW TO ORANGE BASED ON HAVING 3 NUCLEAR UNITS DOWN (CATAWBA, McGUIRE AND OCONEE) *  
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 97   COASTDOWN TO REFUELING OUTAGE    
Summer 0 10/13/2006 REFUELING OUTAGE    
Surry 1 100        
Surry 2 0 10/07/2006 STARTUP PREPARATIONS IN PROGRESS    
Turkey Point 3 100        
Turkey Point 4 0 10/30/2006 DEFUELED    
Vogtle 1 98     *  
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100     *  
Byron 1 100   U1 TRANSFORMER OUTAGE; SAFETY BUSES CROSS TIED TO U2 *  
Byron 2 100   SUPPORTING U1 TRANSFORMER OUTAGE WITH SAFETY BUS CROSS TIE TO U1 *  
Clinton 93   100% ELECTRICAL CAPABILITY; RESERVE AUX TRANSFORMER MAINTENANCE *  
D.C. Cook 1 7   INCREASING POWER *  
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 85   83% ELECTRICAL CAPABILITY - HOLDING POWER DUE TO DAMAGED FEEDWATER HEATER    
Dresden 3 0 11/03/2006 REFUELING OUTAGE    
Duane Arnold 54   INCREASING POWER *  
Fermi 2 100        
Kewaunee 0 11/10/2006 TRIP - SEE EN #42983 * 1
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 98   FEEDWATER HEATER MAINTENANCE *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 0 10/15/2006 STARTUP PREPARATIONS IN PROGRESS    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100     *  
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 10/20/2006 REFUELING OUTAGE *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/09/2006 DEFUELED    
Grand Gulf 1 100   SCHEDULED 500KV FRANKLIN TO BRASWELL LINE OUTAGE TIL 11/12    
Palo Verde 1 100     *  
Palo Verde 2 0 09/29/2006 STARTUP PREPARATIONS IN PROGRESS    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 DEFUELED    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 51   INCREASING POWER *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021