The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 9, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 10/01/2006 REFUELING OUTAGE *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100     *  
Ginna 91   HOLDING FOR FW REG VALVE TUNING *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100   ALTERNATE ELECTRICAL CONFIG WITH PLANNED OUTAGE OF #20 BUS    
Limerick 2 100   ALTERNATE ELECTRICAL CONFIG WITH PLANNED OUTAGE OF #20 BUS    
Millstone 2 0 10/06/2006 REFUELING    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 10/15/2006 REFUELING OUTAGE    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 8   HOLDING POWER FOR TURBINE EXCITER WIRING REPAIRS - ANTICIPATE COMPLETION BY 0600 EST *  
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100   2 (500 KV) OF 7 OFFSITE LINES OOS.    
Browns Ferry 3 100   2 (500 KV) OF 7 OFFSITE LINES OOS.    
Brunswick 1 100        
Brunswick 2 0 11/01/2006 REACTOR SCRAM - SEE EN# 42955 - TRANFORMER STATUS - SAT RE-ENERGIZED - UAT UNAVAILABLE. *  
Catawba 1 94   REDUCED POWER FOR MAIN STEAM SAFETY VALVE TESTING *  
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/16/2006 STARTUP PREPARATIONS IN PROGRESS - ANTICIPATE CRITICALITY ON DAYSHIFT *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 DEFUELED    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 98   COASTDOWN TO REFUELING OUTAGE    
Summer 0 10/13/2006 REFUELING OUTAGE    
Surry 1 100        
Surry 2 0 10/07/2006 STARTUP PREPARATIONS IN PROGRESS    
Turkey Point 3 100        
Turkey Point 4 0 10/30/2006 DEFUELED    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 91   INCREASING POWER *  
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/15/2006 STARTUP PREPARATIONS IN PROGRESS    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 85   DAMAGED FEEDWATER HEATER *  
Dresden 3 0 11/03/2006 REFUELING OUTAGE    
Duane Arnold 0 11/05/2006 STARTUP IN PROGRESS *  
Fermi 2 100     *  
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 97   FEEDWATER HEATER MAINTENANCE - MAINTENANCE ON ONE OFFSITE POWER FEED TO SAFETY BUSES. *  
Perry 1 100     *  
Point Beach 1 100        
Point Beach 2 0 10/15/2006 STARTUP PREPARATIONS IN PROGRESS *  
Prairie Island 1 100        
Prairie Island 2 98   INCREASING POWER FOLLOWING RESOLUTION OF RCP SEAL LEAK ISSUE *  
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 74   INCREASING POWER *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 10/20/2006 REFUELING OUTAGE - GRID STATUS YELLOW DUE TO PLANNED OUTAGE ON 2 OF 5 RING BUS FEEDERS *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/09/2006 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 09/29/2006 STARTUP PREPARATIONS IN PROGRESS *  
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 DEFUELED    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 10/06/2006 STARTUP PREPARATIONS IN PROGRESS *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.