Power Reactor Status Report for November 8, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 10/01/2006 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 98   INCREASING POWER *  
Ginna 92   HOLDING FOR FW REG VALVE TUNING *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100   ALTERNATE ELECTRICAL CONFIG WITH PLANNED OUTAGE OF #20 BUS    
Limerick 2 100   ALTERNATE ELECTRICAL CONFIG WITH PLANNED OUTAGE OF #20 BUS    
Millstone 2 0 10/06/2006 REFUELING    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 0 10/15/2006 REFUELING OUTAGE    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 16   STARTUP IN PROGRESS - MAIN TURBINE TESTING *  
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100   2 (500 KV) OF 7 OFFSITE LINES OOS. *  
Browns Ferry 3 100   2 (500 KV) OF 7 OFFSITE LINES OOS. *  
Brunswick 1 100        
Brunswick 2 0 11/01/2006 REACTOR SCRAM - SEE EN# 42955    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/16/2006 STARTUP PREPARATIONS IN PROGRESS *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 DEFUELED    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 98   COASTDOWN TO REFUELING OUTAGE *  
Summer 0 10/13/2006 REFUELING OUTAGE    
Surry 1 100        
Surry 2 0 10/07/2006 STARTUP PREPARATIONS IN PROGRESS *  
Turkey Point 3 100        
Turkey Point 4 0 10/30/2006 DEFUELED    
Vogtle 1 100     *  
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 90   HOLDING *  
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/15/2006 COMING OUT OF REFUELING OUTAGE *  
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 85   SECONDARY SIDE FEEDWATER HEATER PROBLEM    
Dresden 3 0 11/03/2006 REFUELING OUTAGE    
Duane Arnold 0 11/05/2006 TURBINE TRIP. SEE EVENT 42966    
Fermi 2 100   1 OF 3 120KV OFFSITE POWER LINES SCHEDULED FOR MAINTENANCE ON 11/08/06    
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 97   HOLDING *  
Perry 1 100   YELLOW - PLANNED ACTIVITY *  
Point Beach 1 100        
Point Beach 2 0 10/15/2006 COMING OUT OF REFUELING OUTAGE    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 16   INCREASING POWER *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 10/20/2006 REFUELING OUTAGE.    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/09/2006 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 09/29/2006 COMING OUT OF REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 DEFUELED    
South Texas 1 100     *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 10/06/2006 COMING OUT OF REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021