The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 5, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 10/01/2006 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 14   STARTUP INCREASING POWER *  
Ginna 85   HOLDING FOR TESTS *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 10/06/2006 REFUELING    
Millstone 3 100        
Nine Mile Point 1 100     *  
Nine Mile Point 2 100        
Oyster Creek 0 10/15/2006 REFUELING OUTAGE    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 100     *  
Seabrook 1 0 09/30/2006 REFUELING OUTAGE    
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 12   INCREASING POWER *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100   500 KV OFFSITE LINE OOS. 1 OF 7 OFFSITE LINES.    
Browns Ferry 3 100   500 KV OFFSITE LINE OOS. 1 OF 7 OFFSITE LINES.    
Brunswick 1 100        
Brunswick 2 0 11/01/2006 REACTOR SCRAM - SEE EN# 42955 *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 87   TURBINE TESTS *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/16/2006 REFUELING OUTAGE    
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 DEFUELED *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100     *  
Sequoyah 2 100     *  
Summer 0 10/13/2006 REFUELING OUTAGE *  
Surry 1 100        
Surry 2 0 10/07/2006 REFUELING OUTAGE *  
Turkey Point 3 100        
Turkey Point 4 0 10/30/2006 REFUELING OUTAGE    
Vogtle 1 100     *  
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED - REPLACING ALL 4 STEAM GENERATORS    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 57   HOLDING FOR MAINTENANCE *  
Byron 1 100   TRANSFORMER OUTAGE UNIT 1    
Byron 2 100   TRANSFORMER OUTAGE UNIT 1    
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/15/2006 COMING OUT OF REFUELING OUTAGE    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 85   SECONDARY SIDE FEEDWATER HEATER PROBLEM *  
Dresden 3 0 11/03/2006 REFUELING OUTAGE    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 99   HOLDING - COMPUTER CONVERSION PROBLEMS    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 83   INCREASING POWER *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 0 10/15/2006 COMING OUT OF REFUELING OUTAGE    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 0 10/31/2006 REACTOR TRIP - SEE EN# 42950    
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 10/20/2006 REFUELING OUTAGE.    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/09/2006 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 09/29/2006 COMING OUT OF REFUELING OUTAGE    
Palo Verde 3 99   HIGH RATE BLOWDOWN *  
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 DEFUELED    
South Texas 1 48   HOLDING *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 10/06/2006 COMING OUT OF REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021