The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for November 3, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 10/01/2006 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 0 10/08/2006 REFUELING OUTAGE    
Ginna 6   HOLDING FOR GENERATOR OUTPUT BREAKER CHECKS *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 10/06/2006 REFUELING *  
Millstone 3 100        
Nine Mile Point 1 99     *  
Nine Mile Point 2 100        
Oyster Creek 0 10/15/2006 REFUELING OUTAGE    
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 82   INCREASING POWER *  
Seabrook 1 0 09/30/2006 START-UP IN PROGRESS *  
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 0 11/02/2006 TRIP - SEE EN #42957 * 1
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100   500 KV OFFSITE LINE TO GO OOS. 1 OF 7 OFFSITE LINES. *  
Browns Ferry 3 100   500 KV OFFSITE LINE TO GO OOS. 1 OF 7 OFFSITE LINES. *  
Brunswick 1 81   BEGAN A S/D BUT NOW HOLDING - SEE EN #42960. *  
Brunswick 2 0 11/01/2006 REACTOR SCRAM - SEE EN# 42955    
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/16/2006 REFUELING OUTAGE    
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 REFUELING OUTAGE - DEFUELED    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 10/13/2006 DEFUELED    
Surry 1 100        
Surry 2 0 10/07/2006 CORE ON-LOAD IN PROGRESS    
Turkey Point 3 100        
Turkey Point 4 0 10/30/2006 REFUELING OUTAGE *  
Vogtle 1 100     *  
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED - REPLACING ALL 4 STEAM GENERATORS    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 48   INCREASING POWER *  
Byron 1 100        
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/15/2006 REFUELING OUTAGE    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 88   UNPLANNED DOWNPOWER DUE TO SECONDARY SIDE FEEDWATER HEATER TRIP *  
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 98   INCREASING POWER *  
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 0 11/01/2006 T/S SHUTDOWN - SEE EN #42954    
Perry 1 100        
Point Beach 1 100        
Point Beach 2 0 10/15/2006 RELOAD IN PROGRESS    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 95   INCREASING POWER *  
Callaway 100        
Columbia Generating Station 0 10/31/2006 REACTOR TRIP - SEE EN# 42950    
Comanche Peak 1 100        
Comanche Peak 2 100     *  
Cooper 0 10/20/2006 REFUELING OUTAGE. PLANNED WORK ON 1 OF 5 345KV OFFSITE LINES TODAY.    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/09/2006 REFUELING OUTAGE *  
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 09/29/2006 REDUCED INVENTORY MID LOOP OPERATION *  
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 REFUELING OUTAGE    
South Texas 1 0 09/30/2006 START-UP IN PROGRESS *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 10/06/2006 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021