The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Power Reactor Status Report for October 29, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 10/01/2006 REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100     *  
FitzPatrick 0 10/08/2006 REFUELING OUTAGE    
Ginna 0 10/08/2006 REFUELING OUTAGE *  
Hope Creek 1 100        
Indian Point 2 100   RING BUSS MAINTENANCE IN SWITCHYARD HIGH WINDS ADVISORY *  
Indian Point 3 100   HIGH WINDS ADVISORY *  
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 10/06/2006 DEFUELED.    
Millstone 3 64   DOWNPOWER FOR INTAKE SEAWEED *  
Nine Mile Point 1 100   WEATHER ADVISORY *  
Nine Mile Point 2 100   WEATHER ADVISORY *  
Oyster Creek 0 10/15/2006 REFUELING OUTAGE *  
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 0 10/10/2006 REFUELING OUTAGE    
Seabrook 1 0 09/30/2006 REFUELING OUTAGE    
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED 500KV LINE MAINTENANCE *  
Browns Ferry 2 100   500KV LINE MAINTENANCE *  
Browns Ferry 3 100   500KV LINE MAINTENANCE *  
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/16/2006 REFUELING OUTAGE    
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 REFUELING OUTAGE - DEFUELED    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100     *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 0 10/13/2006 DEFUELED SAFEGUARD BUSSES ON SAME OFFSITE POWER SOURCE    
Surry 1 100        
Surry 2 0 10/07/2006 DEFUELED    
Turkey Point 3 100        
Turkey Point 4 50   LOWERING POWER FOR REFUELING OUTAGE ON 10/30 *  
Vogtle 1 0 09/16/2006 REFUELING OUTAGE    
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED - REPLACING ALL 4 STEAM GENERATORS    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 0 10/15/2006 REFUELING OUTAGE    
Byron 1 100        
Byron 2 100        
Clinton 95   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/15/2006 REFUELING OUTAGE    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY *  
Dresden 3 99   100% ELECTRICAL CAPABILITY *  
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100   345 KV LINE WORK    
Kewaunee 73   NI CALIBRATIONS IN PROGRESS *  
La Salle 1 100        
La Salle 2 100     *  
Monticello 100        
Palisades 100        
Perry 1 100     *  
Point Beach 1 100   TAKING DOWN ONE 345 KV TRANSMISSION LINE (1 OF 4)    
Point Beach 2 0 10/15/2006 DEFUELED. TAKING DOWN ONE 345 KV TRANSMISSION LINE (1 OF 4)    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 18   HOLDING FOR POWER ASCENSION TESTING *  
Callaway 100   YELLOW GRID STATUS *  
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 80   HOLDING FOR NORMAL POWER ASCENSION TESTING *  
Cooper 0 10/20/2006 REFUELING OUTAGE.    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/09/2006 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 0 09/29/2006 CORE RELOAD IN PROGRESS    
Palo Verde 3 99   STEAM GENERATOR BLOWDOWNS *  
River Bend 1 100     *  
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 REFUELING OUTAGE    
South Texas 1 0 09/30/2006 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 10/06/2006 REFUELING OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021