Power Reactor Status Report for October 7, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 0 10/01/2006 REFUELING OUTAGE *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 89   COASTDOWN TO REFUELING OUTAGE    
Ginna 90   COASTDOWN TO REFUELING OUTAGE *  
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 10/06/2006 REFUELING OUTAGE - RCS COOLDOWN IN PROGRESS *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 92   COASTDOWN TO REFUELING OUTAGE    
Peach Bottom 2 0 09/15/2006 CRITICAL WITH STARTUP IN PROGRESS *  
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 87   COASTDOWN TO REFUELING OUTAGE *  
Seabrook 1 0 09/30/2006 REFUELING OUTAGE - REDUCED INVENTORY *  
Susquehanna 1 100        
Susquehanna 2 0 09/29/2006 PLANNED RE-CHANNELING OUTAGE    
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 88   REDUCING POWER TO 65% FOR SCRAM TIME TESTING AND ROD PATTERN ADJUSTMENT *  
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/16/2006 REFUELING OUTAGE - CORE RELOAD IN PROGRESS *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 REFUELING OUTAGE - RCS COOLDOWN IN PROGRESS *  
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 0 09/16/2006 DEFUELED    
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED - REPLACING ALL 4 STEAM GENERATORS *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 97   COASTDOWN TO REFUELING OUTAGE *  
Byron 1 0 09/10/2006 REFUELING OUTAGE    
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/15/2006 DEFUELED    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 99   100% ELECTRICAL CAPABILITY    
Dresden 3 100   100% ELECTRICAL CAPABILITY *  
Duane Arnold 96   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 0 09/02/2006 DEFUELED    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100     *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 23   FEED REG VALVE MAINTENANCE - GENERATOR WILL REMAIN ON-LINE *  
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY *  
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 09/19/2006 DEFUELED    
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 91   COASTDOWN TO REFUELING OUTAGE *  
Cooper 96   COASTDOWN TO REFUELING OUTAGE *  
Diablo Canyon 1 100   230KV MORRO BAY-DIABLO LINE (STARTUP) WILL BE OUT-OF-SERVICE AT 0600 FOR MAINTENANCE *  
Diablo Canyon 2 100   230KV MORRO BAY-DIABLO LINE (STARTUP) WILL BE OUT-OF-SERVICE AT 0600 FOR MAINTENANCE *  
Fort Calhoun 0 09/09/2006 DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 0 09/19/2006 RESOLVING CHECK VALVE ISSUE *  
Palo Verde 2 0 09/29/2006 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 97   STEAM GENERATOR TUBE PLUGGING LIMITATION INCREASING POWER AFTER SURVEILLANCE *  
San Onofre 3 100     *  
South Texas 1 0 09/30/2006 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 0 10/06/2006 REFUELING OUTAGE *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021