Power Reactor Status Report for September 23, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 93   COASTDOWN TO REFUELING OUTAGE *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100     *  
Millstone 3 100     *  
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 97   COASTDOWN TO REFUELING OUTAGE *  
Peach Bottom 2 0 09/15/2006 REFUELING OUTAGE    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100        
Salem 2 97   COASTDOWN TO REFUELING OUTAGE    
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 95   CONDENSATE DEMIN BEING SERVICED *  
Brunswick 2 52   FUEL LEAK SUPPRESSION TEST *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100     *  
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 09/16/2006 REFUELING OUTAGE    
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100   SWITCHYARD MAINTENANCE    
Turkey Point 4 100   SWITCHYARD MAINTENANCE    
Vogtle 1 0 09/16/2006 REFUELING OUTAGE    
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 DEFUELED    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 0 09/10/2006 REFUELING OUTAGE    
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY ONE 345 KV LINE REMOVED FROM SERVICE - RESTORATION ANTICIPATED AT 1600 ON 9/22    
D.C. Cook 1 0 09/15/2006 REFUELING OUTAGE    
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 98   100% ELECTRICAL CAPABILITY *  
Dresden 3 98   100% ELECTRICAL CAPABILITY    
Duane Arnold 96   100% ELECTRICAL CAPABILITY    
Fermi 2 71   ROD PATTERN ADJUSTMENTS. MAINTANANCE ON 1 345 KV LINE ON 9/26. *  
Kewaunee 0 09/02/2006 DEFUELED    
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 09/19/2006 REFUELING OUTAGE    
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 85   ROD ADJUSTMENTS AND COASTDOWN TO REFUELING OUTAGE *  
Diablo Canyon 1 100   ONE 230 KV LINE WILL BE REMOVED FROM SERVICE 9/22    
Diablo Canyon 2 100   ONE 230 KV LINE WILL BE REMOVED FROM SERVICE 9/22    
Fort Calhoun 0 09/09/2006 REFUELING OUTAGE - DEFUELED    
Grand Gulf 1 100        
Palo Verde 1 0 09/19/2006 REPLACING PRESSURIZER HEATERS *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 99   LIMITED DUE TO SG TUBE PLUGGING LIMIT    
San Onofre 3 100        
South Texas 1 88   COASTDOWN TO REFUELING OUTAGE *  
South Texas 2 99   INCREASING POWER FOLLOWING TURBINE VALVE TESTING *  
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021